EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Coordinated Operation Strategy for Large Wind Power Base Considering Wind Power Uncertainty and Frequency Stability Constraint

Hongtao Liu, Huifan Xie, Jinning Zhang, Guoteng Wang, Ying Huang

Energies · 30.08.2025 · 18 (17) · 4625

DOI: 10.3390/en18174625 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Energies, online erschienen am 30.08.2025. Verfasst von Hongtao Liu und 4 weiteren Autor:innen. Die Arbeit wurde bisher 3-mal zitiert (Crossref) und nennt 31 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Science and Technology Project of China Southern Power Grid Company Limited (China).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

In a large wind power base, it becomes unrealistic to rely only on synchronous generators to resist the uncertainty of wind power. A feasible way is to make wind turbines (WTs) and battery energy storage systems (BESSs) participate in frequency regulation. Taking into account the frequency regulation service of WTs and BESSs, the Coordinated Operation Strategy (COS) of the Wind–BESS–Thermal power model will become difficult to solve due to strong nonlinearity. To cope with this challenge, an improved Primary Frequency Regulation (PFR) model is first established considering the frequency regulation of WTs and BESSs. Based on the improved PFR model, the analytical expression of frequency stability constraints is deduced. Next, in view of the wind power uncertainty, the box-type ensemble robust optimization theory is introduced into the day-ahead optimal scheduling, and a robust COS model considering wind power uncertainty and frequency stability constraints is proposed. Then, a linear equivalent transformation method is designed, based on which the original COS model is transformed into a Mixed Integer Linear Programming (MILP) problem. Finally, a modified IEEE 39-bus system is adopted to test the effectiveness of the proposed method.

Förderung

  • Science and Technology Project of China Southern Power Grid Company Limited (China)

Zitieren

APA

Liu, H., Xie, H., Zhang, J., Wang, G., & Huang, Y. (2025). Coordinated Operation Strategy for Large Wind Power Base Considering Wind Power Uncertainty and Frequency Stability Constraint. Energies, 18(17), 4625. https://doi.org/10.3390/en18174625

Vancouver

Liu H, Xie H, Zhang J, Wang G, Huang Y. Coordinated Operation Strategy for Large Wind Power Base Considering Wind Power Uncertainty and Frequency Stability Constraint. Energies. 2025;18(17):4625. doi:10.3390/en18174625

BibTeX
@article{Liu2025,
  author = {Liu, Hongtao and Xie, Huifan and Zhang, Jinning and Wang, Guoteng and Huang, Ying},
  title = {Coordinated Operation Strategy for Large Wind Power Base Considering Wind Power Uncertainty and Frequency Stability Constraint},
  journal = {Energies},
  year = {2025},
  volume = {18},
  number = {17},
  pages = {4625},
  doi = {10.3390/en18174625}
}
Kostenlos starten →