Forecasting Electricity Production in a Small Hydropower Plant (SHP) Using Artificial Intelligence (AI)
Energies · 19.12.2024 · 17 (24) · 6401
DOI: 10.3390/en17246401 ↗Kurz gefasst
Fachartikel in der Zeitschrift Energies, online erschienen am 19.12.2024. Verfasst von Dawid Maciejewski und 2 weiteren Autor:innen. Die Arbeit wurde bisher 11-mal zitiert (Crossref) und nennt 62 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Ministry of Education and Science for the University of Agriculture in Krakow.
Abstract (Originalsprache)
This article devises the Artificial Intelligence (AI) methods of designing models of short-term forecasting (in 12 h and 24 h horizons) of electricity production in a selected Small Hydropower Plant (SHP). Renewable Energy Sources (RESs) are difficult to predict due to weather variability. Electricity production by a run-of-river SHP is marked by the variability related to the access to instantaneous flow in the river and weather conditions. In order to develop predictive models of an SHP facility (installed capacity 760 kW), which is located in Southern Poland on the Skawa River, hourly data from nearby meteorological stations and a water gauge station were collected as explanatory variables. Data on the water management of the retention reservoir above the SHP were also included. The variable to be explained was the hourly electricity production, which was obtained from the tested SHP over a period of 3 years and 10 months. Obtaining these data to build models required contact with state institutions and private entrepreneurs of the SHP. Four AI methods were chosen to create predictive models: two types of Artificial Neural Networks (ANNs), Multilayer Perceptron (MLP) and Radial Base Functions (RBFs), and two types of decision trees methods, Random Forest (RF) and Gradient-Boosted Decision Trees (GBDTs). Finally, after applying forecast quality measures of Mean Absolute Error (MAE), Mean Absolute Percentage Error (MAPE), and Coefficient of Determination (R2), the most effective model was indicated. The decision trees method proved to be more accurate than ANN models. The best GBDT models’ errors were MAPE 3.17% and MAE 9.97 kWh (for 12 h horizon), and MAPE 3.41% and MAE 10.96 kWh (for 24 h horizon). MLPs had worse results: MAPE from 5.41% to 5.55% and MAE from 18.02 kWh to 18.40 kWh (for 12 h horizon), and MAPE from 7.30% to 7.50% and MAE from 24.12 kWh to 24.83 kWh (for 24 h horizon). Forecasts using RBF were not made due to the very low quality of training and testing (the correlation coefficient was approximately 0.3).
Förderung
- Ministry of Education and Science for the University of Agriculture in Krakow
Zitieren
APA
Maciejewski, D., Mudryk, K., & Sporysz, M. (2024). Forecasting Electricity Production in a Small Hydropower Plant (SHP) Using Artificial Intelligence (AI). Energies, 17(24), 6401. https://doi.org/10.3390/en17246401
Vancouver
Maciejewski D, Mudryk K, Sporysz M. Forecasting Electricity Production in a Small Hydropower Plant (SHP) Using Artificial Intelligence (AI). Energies. 2024;17(24):6401. doi:10.3390/en17246401
BibTeX
@article{Maciejewski2024,
author = {Maciejewski, Dawid and Mudryk, Krzysztof and Sporysz, Maciej},
title = {Forecasting Electricity Production in a Small Hydropower Plant (SHP) Using Artificial Intelligence (AI)},
journal = {Energies},
year = {2024},
volume = {17},
number = {24},
pages = {6401},
doi = {10.3390/en17246401}
}