EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Reasonable Energy-Abandonment Operation of a Combined Power Generation System with an Ultra-High Proportion of Renewable Energy

Hao Zhang, Jingyue Yang, Chenxi Li, Pengcheng Guo, Jun Liu, Ruibao Jin, Jing Hu, Fengyuan Gan, Fei Cao

Energies · 18.04.2024 · 17 (8) · 1936

DOI: 10.3390/en17081936 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Energies, online erschienen am 18.04.2024. Verfasst von Hao Zhang und 8 weiteren Autor:innen. Die Arbeit wurde bisher 7-mal zitiert (Crossref) und nennt 33 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Natural Science Foundation of China, China Postdoctoral Science Foundation, Natural Science Basic Research Program of Shaanxi.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

With large-scale grid-connected renewable energy, new power systems require more flexible and reliable energy storage power sources. Pumped storage stations play an important role in peak shaving, valley filling, and promoting renewable energy consumption. This paper presents the reasonable energy-abandonment operation of a combined power generation system (CPGS), in which a pumped storage station is the core control power, with an ultra-high proportion of renewable energy. Firstly, based on the seasonal characteristics of wind, solar, and load demand, typical days are selected through improved clustering analysis algorithms. Then, a daily optimal scheduling model for combined power generation systems (CPGS) is developed with the goals of economy, low-carbon, and stable operation. Finally, the correlation between the energy-abandonment rate and pumped storage station peak shaving and system optimization operation indicators is obtained by a reasonable energy-abandonment calculation method considering source-grid-load coordination. Taking the operation data of an energy base in the western region of China as an example, when the penetration rate of renewable energy is 60–70% in the future, the operating cost on the power side is greatly affected by the construction of the source side. When the system operates at a planned reasonable energy-abandonment rate of 2%, electricity regulation, load tracking, and daily operating costs all show better performance.

Förderung

  • National Natural Science Foundation of China
  • China Postdoctoral Science Foundation
  • Natural Science Basic Research Program of Shaanxi

Zitieren

APA

Zhang, H., Yang, J., Li, C., Guo, P., Liu, J., Jin, R., Hu, J., Gan, F., & Cao, F. (2024). Reasonable Energy-Abandonment Operation of a Combined Power Generation System with an Ultra-High Proportion of Renewable Energy. Energies, 17(8), 1936. https://doi.org/10.3390/en17081936

Vancouver

Zhang H, Yang J, Li C, Guo P, Liu J, Jin R, et al. Reasonable Energy-Abandonment Operation of a Combined Power Generation System with an Ultra-High Proportion of Renewable Energy. Energies. 2024;17(8):1936. doi:10.3390/en17081936

BibTeX
@article{Zhang2024,
  author = {Zhang, Hao and Yang, Jingyue and Li, Chenxi and Guo, Pengcheng and Liu, Jun and Jin, Ruibao and Hu, Jing and Gan, Fengyuan and Cao, Fei},
  title = {Reasonable Energy-Abandonment Operation of a Combined Power Generation System with an Ultra-High Proportion of Renewable Energy},
  journal = {Energies},
  year = {2024},
  volume = {17},
  number = {8},
  pages = {1936},
  doi = {10.3390/en17081936}
}
Kostenlos starten →