EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Environmental Assessment of Hellisheidi Geothermal Power Plant based on Exergy Allocation Factors for Heat and Electricity Production

Maryori Díaz-Ramírez, Snorri Jokull, Claudio Zuffi, María Dolores Mainar-Toledo, Giampaolo Manfrida

Energies · 22.04.2023 · 16 (9) · 3616

DOI: 10.3390/en16093616 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Energies, online erschienen am 22.04.2023. Verfasst von Maryori Díaz-Ramírez und 4 weiteren Autor:innen. Die Arbeit wurde bisher 15-mal zitiert (Crossref) und nennt 26 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: European Union’s Horizon 2020 Research and Innovation program.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The Hellisheidi geothermal power plant, located in Iceland, is a combined heat and power double-flash geothermal plant with an installed capacity of 303.3 MW of electricity and 133 MW of hot water. This study aimed to elucidate the environmental impacts of the electricity and heat production from this double-flash geothermal power plant. In this vein, firstly, the most updated inventory of the plant was generated, and secondly, a life-cycle assessment approach based on the exergy allocation factor was carried out instead of applying the traditionally used allocations in terms of mass and energy. The functional unit was defined as the production of 1 kWh of electricity and 1 kWh of hot water for district heating. The life-cycle stages included the (i) construction, (ii) operation (including abatement operations and maintenance), and (iii) well closure of the geothermal plant. All of the life-cycle stages from construction to dismantling were considered. Finally, the results on the partitioning of the environmental impact to electricity and heat with exergy allocations showed that most of the impact should be charged to electricity, as expected. Furthermore, the distribution of the environmental impacts among the life-cycle stages determined that the construction stage was the most impactful for the electricity and heat production. This result was attributable to the large consumption of steel that was demanded during the construction of the geothermal power plant (geothermal wells, equipment, and buildings). Impacts due to the abatement stage demonstrated that this stage satisfactorily reduced the total impact attributed to the three life-cycle stages of the geothermal power plant.

Förderung

  • European Union’s Horizon 2020 Research and Innovation program

Zitieren

APA

Díaz-Ramírez, M., Jokull, S., Zuffi, C., Mainar-Toledo, M. D., & Manfrida, G. (2023). Environmental Assessment of Hellisheidi Geothermal Power Plant based on Exergy Allocation Factors for Heat and Electricity Production. Energies, 16(9), 3616. https://doi.org/10.3390/en16093616

Vancouver

Díaz-Ramírez M, Jokull S, Zuffi C, Mainar-Toledo MD, Manfrida G. Environmental Assessment of Hellisheidi Geothermal Power Plant based on Exergy Allocation Factors for Heat and Electricity Production. Energies. 2023;16(9):3616. doi:10.3390/en16093616

BibTeX
@article{DazRamrez2023,
  author = {Díaz-Ramírez, Maryori and Jokull, Snorri and Zuffi, Claudio and Mainar-Toledo, María Dolores and Manfrida, Giampaolo},
  title = {Environmental Assessment of Hellisheidi Geothermal Power Plant based on Exergy Allocation Factors for Heat and Electricity Production},
  journal = {Energies},
  year = {2023},
  volume = {16},
  number = {9},
  pages = {3616},
  doi = {10.3390/en16093616}
}
Kostenlos starten →