Two-Layer HVDC Frequency Coordination with Local Energy Constraints and Planned Support Withdrawal
Electronics · 03.11.2026 · 15 (21) · 5096
DOI: 10.3390/electronics15215096 ↗Kurz gefasst
Fachartikel in der Zeitschrift Electronics, online erschienen am 03.11.2026. Verfasst von Fan Li und 5 weiteren Autor:innen. Die Arbeit nennt 40 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: State Grid Corporation of China.
Abstract (Originalsprache)
Finite-energy frequency support through multiple high-voltage direct-current (HVDC) links requires coordination of power delivery, device constraints, and support withdrawal, because maximizing the initial response can exhaust a source too early or deepen the frequency minimum after support ends. This paper develops a two-layer method that separates the energy supplied to a synchronous system by asynchronously connected sources from the power redistributed inside it by embedded links. A local scalar projection enforces the present source and capacitor constraints at every converter, with explicit conditions for discrete invariance, bounded-error sampled execution, finite-rate withdrawal, and the capacitor discharge time. A causal regional linear program allocates support over time and constrains the frequency response after the scheduled withdrawal; its feasibility condition is derived in terms of the remaining source energy, and late calculations or expired instructions revert to local frequency response. In a two-area benchmark with 900 MJ of source energy and a 20 MW internal transfer limit, 5 Hz coordination reduces the maximum frequency depression by 17.38% and 13.83% relative to independently searched static gains, and three-phase average-value electrical realization retains 16.57% and 13.25%. In 70 newly executed plant-perturbation cases with load damping, governor, secondary, inertia, and tie-line parameters varied by up to 20%, the controller improves on fixed droop in every case and on the searched static gains in 63, without device-limit violations; in a three-area extension with three stations the reductions are 6.60% to 17.55% relative to searched static gains and 38.04% to 42.05% relative to fixed droop. Measured calculation times identify the linear program as the only real-time bottleneck and quantify how its size grows with the number of areas and stations.
Förderung
- State Grid Corporation of China
Zitieren
APA
Li, F., Qin, J., Si, Y., Ma, B., Xin, S., & Wang, D. (2026). Two-Layer HVDC Frequency Coordination with Local Energy Constraints and Planned Support Withdrawal. Electronics, 15(21), 5096. https://doi.org/10.3390/electronics15215096
Vancouver
Li F, Qin J, Si Y, Ma B, Xin S, Wang D. Two-Layer HVDC Frequency Coordination with Local Energy Constraints and Planned Support Withdrawal. Electronics. 2026;15(21):5096. doi:10.3390/electronics15215096
BibTeX
@article{Li2026,
author = {Li, Fan and Qin, Jishuo and Si, Yuan and Ma, Binqi and Xin, Shujun and Wang, Dan},
title = {Two-Layer HVDC Frequency Coordination with Local Energy Constraints and Planned Support Withdrawal},
journal = {Electronics},
year = {2026},
volume = {15},
number = {21},
pages = {5096},
doi = {10.3390/electronics15215096}
}
EUVIMED