Coordinated Optimization Method for Post-Disaster Transmission Line Repair and System Restoration Against Ice and Snow Disasters
Electronics · 27.04.2026 · 15 (9) · 1844
DOI: 10.3390/electronics15091844 ↗Kurz gefasst
Fachartikel in der Zeitschrift Electronics, online erschienen am 27.04.2026. Verfasst von Liang Yang und 4 weiteren Autor:innen. Die Arbeit nennt 24 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Science and technology project of State Grid Corporation of China.
Abstract (Originalsprache)
A coordinated optimization method for emergency repair scheduling and system operation restoration is proposed to address large-scale transmission line outages caused by extreme weather events such as ice and snow disasters. First, an active outage scenario for transmission lines is constructed based on the Jones icing thickness model and an exponential failure probability model, while incorporating the spatial distribution characteristics of ice disasters. Subsequently, a bi-level optimization model with repair resource constraints is developed. The upper-level model determines the transmission line repair schedule with the objective of minimizing the total repair time while taking system power supply restoration efficiency into account. Based on the completion times of line repairs, the lower-level model optimizes the system restoration process by considering power flow constraints, generator start-up processes, and load restoration characteristics. To address the challenges posed by discrete operational states and strongly coupled bi-level constraints that are difficult to solve using conventional approaches, a logic-based Integer L-shaped coordinated solution method is proposed. Finally, the effectiveness of the proposed method is validated through case studies based on the IEEE New England 10-unit 39-bus system. The results demonstrate that the proposed method can significantly improve system load restoration levels while maintaining high repair efficiency.
Förderung
- Science and technology project of State Grid Corporation of China
Zitieren
APA
Yang, L., Zhang, W., Zhai, Y., Chen, Y., & Wan, Q. (2026). Coordinated Optimization Method for Post-Disaster Transmission Line Repair and System Restoration Against Ice and Snow Disasters. Electronics, 15(9), 1844. https://doi.org/10.3390/electronics15091844
Vancouver
Yang L, Zhang W, Zhai Y, Chen Y, Wan Q. Coordinated Optimization Method for Post-Disaster Transmission Line Repair and System Restoration Against Ice and Snow Disasters. Electronics. 2026;15(9):1844. doi:10.3390/electronics15091844
BibTeX
@article{Yang2026,
author = {Yang, Liang and Zhang, Wenchao and Zhai, Yong and Chen, Yu and Wan, Qing},
title = {Coordinated Optimization Method for Post-Disaster Transmission Line Repair and System Restoration Against Ice and Snow Disasters},
journal = {Electronics},
year = {2026},
volume = {15},
number = {9},
pages = {1844},
doi = {10.3390/electronics15091844}
}
EUVIMED