EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Hybrid Energy Storage System for Regenerative Braking Utilization and Peak Power Decrease in 3 kV DC Railway Electrification System

Adam Szeląg, Włodzimierz Jefimowski, Tadeusz Maciołek, Anatolii Nikitenko, Maciej Wieczorek, Mirosław Lewandowski

Electronics · 25.04.2025 · 14 (9) · 1752

DOI: 10.3390/electronics14091752 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Electronics, online erschienen am 25.04.2025. Verfasst von Adam Szeląg und 5 weiteren Autor:innen. Die Arbeit wurde bisher 5-mal zitiert (Crossref) und nennt 31 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This paper proposes the sizing optimization method and energy management strategy for a stationary hybrid energy storage system dedicated to a DC traction power supply system. The hybrid energy storage system consists of two modules—a supercapacitor, mainly dedicated to regenerative energy utilization, and a Li-ion battery, aimed to peak power reduction. The sizing method and energy management strategy proposed in this paper aim to reduce the aging effect of lithium-ion batteries. It is shown that the parameters of both modules could be sized independently. The supercapacitor module parameters are sized based on the results of a simulation determining the regenerative power, resulting in limited catenary receptivity. The simulation model of the DC electrification system is validated by comparing the results of the simulation with the measurements of 15 min average power in a 24 h cycle as average values of one year. The battery module is sized based on the statistical data of 15 min substation power value occurrences. The battery energy capacity, its maximum discharge C-rate, and the conditions determining its operation are optimized to achieve the maximum ratio of annual income resulting from peak power reduction to annual operating cost resulting from the battery aging process and total life cycle. The case study prepared for a typical 3 kV DC substation with mixed railway traffic shows that peak power could be reduced by ~1 MW, giving a ~10-year payback period for battery module installation, while the energy consumption could be decreased by 1.9 MWh/24 h, giving a ~7.5-year payback period for supercapacitor module installation. The payback period of the whole energy storage system (ESS) is ~8.4 years.

Zitieren

APA

Szeląg, A., Jefimowski, W., Maciołek, T., Nikitenko, A., Wieczorek, M., & Lewandowski, M. (2025). Hybrid Energy Storage System for Regenerative Braking Utilization and Peak Power Decrease in 3 kV DC Railway Electrification System. Electronics, 14(9), 1752. https://doi.org/10.3390/electronics14091752

Vancouver

Szeląg A, Jefimowski W, Maciołek T, Nikitenko A, Wieczorek M, Lewandowski M. Hybrid Energy Storage System for Regenerative Braking Utilization and Peak Power Decrease in 3 kV DC Railway Electrification System. Electronics. 2025;14(9):1752. doi:10.3390/electronics14091752

BibTeX
@article{Szelg2025,
  author = {Szeląg, Adam and Jefimowski, Włodzimierz and Maciołek, Tadeusz and Nikitenko, Anatolii and Wieczorek, Maciej and Lewandowski, Mirosław},
  title = {Hybrid Energy Storage System for Regenerative Braking Utilization and Peak Power Decrease in 3 kV DC Railway Electrification System},
  journal = {Electronics},
  year = {2025},
  volume = {14},
  number = {9},
  pages = {1752},
  doi = {10.3390/electronics14091752}
}
Kostenlos starten →