EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Construction Technology for High-Altitude Piece-by-Piece Assembly of a Large-Span Steel Sky Corridor in a Complex Urban Environment: A Case Study

Kaifa Dong, Zhengxing Guo, Haibin Sun, Taiyu Zhou, Ruichen Yin, Huangyuanqi Wang

Buildings · 20.11.2026 · 16 (22) · 4636

DOI: 10.3390/buildings16224636 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Buildings, online erschienen am 20.11.2026. Verfasst von Kaifa Dong und 5 weiteren Autor:innen. Die Arbeit nennt 30 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Steel sky corridors often span operating facilities and roads, while hoisting equipment is confined to a basement roof, making integral hoisting impracticable. Using the Nanjing Jinling Zhonghuan project as a case study, an integrated construction-control framework was developed for high-altitude piece-by-piece assembly. Four hoisting schemes were compared, and a staged finite-element model was used to compare temporary-support removal sequences. A load-transfer system with 24 support points and 48 jacks was designed. The selected scheme, an 80 t crane advancing from the fixed end and closing at the cantilever end, reduced the heaviest hoisting unit from 108 t to about 10 t, avoiding basement-roof strengthening. Removing the cantilever-end support first caused an abrupt 45.25 mm deflection, whereas removing the roof supports first limited the mid-span increment to 25.61 mm. Jacks preloaded to 80% of the computed reaction limited the maximum temporary-support reaction to 398.0 kN at roof level and 493.9 kN at ground level. Laser scanning of 140 nodes resulted in a maximum final-position deviation ratio of 2.94‰, close to the project-specific 3‰ control value. The reported structural and construction checks met the adopted criteria, supporting the feasibility of the proposed method.

Zitieren

APA

Dong, K., Guo, Z., Sun, H., Zhou, T., Yin, R., & Wang, H. (2026). Construction Technology for High-Altitude Piece-by-Piece Assembly of a Large-Span Steel Sky Corridor in a Complex Urban Environment: A Case Study. Buildings, 16(22), 4636. https://doi.org/10.3390/buildings16224636

Vancouver

Dong K, Guo Z, Sun H, Zhou T, Yin R, Wang H. Construction Technology for High-Altitude Piece-by-Piece Assembly of a Large-Span Steel Sky Corridor in a Complex Urban Environment: A Case Study. Buildings. 2026;16(22):4636. doi:10.3390/buildings16224636

BibTeX
@article{Dong2026,
  author = {Dong, Kaifa and Guo, Zhengxing and Sun, Haibin and Zhou, Taiyu and Yin, Ruichen and Wang, Huangyuanqi},
  title = {Construction Technology for High-Altitude Piece-by-Piece Assembly of a Large-Span Steel Sky Corridor in a Complex Urban Environment: A Case Study},
  journal = {Buildings},
  year = {2026},
  volume = {16},
  number = {22},
  pages = {4636},
  doi = {10.3390/buildings16224636}
}
Kostenlos starten →