EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Partial Cost Information and Empirical Contingency in Building Retrofit Cost Prediction

Nahyun Kwon, Jongmyeong Kim, Hyosoo Moon, Yonghan Ahn, Sojin Park

Buildings · 13.11.2026 · 16 (22) · 4530

DOI: 10.3390/buildings16224530 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Buildings, online erschienen am 13.11.2026. Verfasst von Nahyun Kwon und 4 weiteren Autor:innen. Die Arbeit nennt 52 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Korean Government.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This study retrospectively evaluated partial cost information and empirical contingency in an archived extract of public-building retrofits. The primary reporting sample comprised 246 records, with all 250 retained for sensitivity analysis. Adding four recorded component costs reduced total-cost mean absolute percentage error (MAPE) from 23.35% to 17.30% for genetic-algorithm-weighted case-based reasoning and from 23.05% to 14.68% for Extra Trees. The primary comparison did not establish a larger improvement for Extra Trees. Predicting the remaining cost and adding the observed subtotal produced 12.72% total-cost MAPE, but remaining-cost-weighted absolute percentage error was 19.28% and remaining-cost MAPE was 29.42%. The paired target-route difference also remained uncertain. Additional nested selection across 14 family-target routes yielded 12.64% total-cost MAPE within the same archive. The historical project-level 90th-percentile (P90) allowance was 35.47%; separate training/calibration/evaluation splits achieved 76–98% coverage with empirical P90 allowances calibrated on disjoint records. For the largest-area holdout, remaining-cost weighted error reached 46.74%, and the 35.47% historical allowance covered only 62% of cases. The selected extract differed from the other records in our 419-record research archive. Field timing and project dates were unavailable. The results support an evaluation framework, not demonstrated early-stage forecasting accuracy or a transferable contingency rate.

Förderung

  • Korean Government

Zitieren

APA

Kwon, N., Kim, J., Moon, H., Ahn, Y., & Park, S. (2026). Partial Cost Information and Empirical Contingency in Building Retrofit Cost Prediction. Buildings, 16(22), 4530. https://doi.org/10.3390/buildings16224530

Vancouver

Kwon N, Kim J, Moon H, Ahn Y, Park S. Partial Cost Information and Empirical Contingency in Building Retrofit Cost Prediction. Buildings. 2026;16(22):4530. doi:10.3390/buildings16224530

BibTeX
@article{Kwon2026,
  author = {Kwon, Nahyun and Kim, Jongmyeong and Moon, Hyosoo and Ahn, Yonghan and Park, Sojin},
  title = {Partial Cost Information and Empirical Contingency in Building Retrofit Cost Prediction},
  journal = {Buildings},
  year = {2026},
  volume = {16},
  number = {22},
  pages = {4530},
  doi = {10.3390/buildings16224530}
}
Kostenlos starten →