EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

An Integrated Computer Vision Framework for Construction Equipment Monitoring, Utilization Analytics, and Decision Support

Ahmed Mahmoud Elganzory, Ruqaya Al-Sabah, Salah Omar Said, Mohamed Tantawy

Buildings · 11.11.2026 · 16 (22) · 4490

DOI: 10.3390/buildings16224490 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Buildings, online erschienen am 11.11.2026. Verfasst von Ahmed Mahmoud Elganzory und 3 weiteren Autor:innen. Die Arbeit nennt 44 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Effective construction-equipment monitoring requires persistent equipment-level information linking visual observations to utilization and planning decisions. This study develops and evaluates an identity-centered framework integrating ten-class YOLOv8m detection, ByteTrack tracking, AprilTag-assisted Global ID reconciliation, scale-normalized motion-state estimation, utilization accounting, and rule-based reallocation support. The selected detector achieved 90.80% micro-F1 on the held-out ConstructionXC7C benchmark (757 images, eight annotated categories). In a matched comparison, selected-checkpoint micro-F1 reached 92.52%, exceeding the original checkpoint by 16.11 percentage points. Across 6000 experimental video frames, 5757 of 5992 annotated excavator observations were matched, with 99.81% adjacent camera–local ID consistency. A controlled 192-pair simulated-transition study associated all 144 same-object pairs using ideal deterministic identity tokens, compared with 99 using a tuned appearance-only baseline; regression tests verified preservation of accumulated equipment histories. In a separate matched analysis of 1040 observations, temporal activity modeling improved idle-state discrimination and reduced video-level sampled-utilization mean absolute error by 41.92 percentage points, achieving an error of 15.11 percentage points. Controlled verification further demonstrated state-service functionality and reviewable zone-reallocation advisories. These findings provide quantitative evidence of component-level performance and traceable monitoring-to-decision functionality, establishing a technical foundation for subsequent construction-site evaluation.

Zitieren

APA

Elganzory, A. M., Al-Sabah, R., Said, S. O., & Tantawy, M. (2026). An Integrated Computer Vision Framework for Construction Equipment Monitoring, Utilization Analytics, and Decision Support. Buildings, 16(22), 4490. https://doi.org/10.3390/buildings16224490

Vancouver

Elganzory AM, Al-Sabah R, Said SO, Tantawy M. An Integrated Computer Vision Framework for Construction Equipment Monitoring, Utilization Analytics, and Decision Support. Buildings. 2026;16(22):4490. doi:10.3390/buildings16224490

BibTeX
@article{Elganzory2026,
  author = {Elganzory, Ahmed Mahmoud and Al-Sabah, Ruqaya and Said, Salah Omar and Tantawy, Mohamed},
  title = {An Integrated Computer Vision Framework for Construction Equipment Monitoring, Utilization Analytics, and Decision Support},
  journal = {Buildings},
  year = {2026},
  volume = {16},
  number = {22},
  pages = {4490},
  doi = {10.3390/buildings16224490}
}
Kostenlos starten →