Multi-UAV Construction Delivery Under Energy Uncertainty: Rank Sensitivity and Knowledge-Driven Scheduling
Buildings · 04.11.2026 · 16 (21) · 4419
DOI: 10.3390/buildings16214419 ↗Kurz gefasst
Fachartikel in der Zeitschrift Buildings, online erschienen am 04.11.2026. Verfasst von Yueqi Hu und 3 weiteren Autor:innen. Die Arbeit nennt 56 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Education Department of Shaanxi Provincial Government, Shaanxi Provincial Basic Research Program of Natural Sciences Project, Xihang University.
Abstract (Originalsprache)
Urban construction sites require timely delivery of lightweight tools, sensors, components, and maintenance parts. We study a three-objective scheduling model that balances fleet mission duration, interval energy consumption, and soft receiving-window deviation. Nominal carried load determines flight time, while uncertain load and wind affect energy and upper-bound battery feasibility. A candidate-pool diagnostic measures changes in scalarized winners, replacement decisions, and an endpoint-separation relation. WV-KD-MOEA/D combines a midpoint decomposition backbone with knowledge-driven operators and weight-vector-aware allocation. Six methods are compared on 27 synthetic test instances with ten repetitions per instance. MOEA/D-DYTS shares the backbone and operator pool in its specification; compared with its outputs, WV-KD-MOEA/D has lower empirical-reference IGD but no significant hypervolume advantage. The midpoint–interval volume–coverage trade-off remains unresolved and depends on the metric and condition. The main comparison provides no evidence of an advantage over fixed-global allocation. A seven-value threshold sweep examines fixed evaluated records from α = 0.50 to 0.90. Mean set size increases from 74.5 to 85.0 under energy-only uncertainty and from 68.1 to 108.5 under coupled-time uncertainty. Energy-only hypervolume varies by less than 0.00038. Coupled-time rates cross the frozen 5% cutoff, and rule agreement ranges from 23 to 29 of 81 blocks. Under the shared R1 endpoint loss, the development-fitted rule improves on the original constant-hybrid default in agreement (27 of 81 versus 6 of 81 held-out condition blocks). Its mean decision regret is also lower (0.000106 versus 0.000156). Constant midpoint performs better throughout the tested α range (42 of 81; 0.000069). The cross-condition results are exploratory and do not establish the best backbone for R2 or R3. The rule describes measured disagreement, and the fixed midpoint design remains the examined default. A companion analysis reruns matched methods on the same geometries under heterogeneous load–wind, coupled travel-time uncertainty, and landed-handover conditions. These results complement the main benchmark without establishing construction-project or field-operational benefits.
Förderung
- Education Department of Shaanxi Provincial Government
- Shaanxi Provincial Basic Research Program of Natural Sciences Project
- Xihang University
- Xi’an Science and Technology Plan
- Central Universities, CHD
- Anhui Provincial Department of Education
Zitieren
APA
Hu, Y., Wang, X., Chi, J., & Wu, L. (2026). Multi-UAV Construction Delivery Under Energy Uncertainty: Rank Sensitivity and Knowledge-Driven Scheduling. Buildings, 16(21), 4419. https://doi.org/10.3390/buildings16214419
Vancouver
Hu Y, Wang X, Chi J, Wu L. Multi-UAV Construction Delivery Under Energy Uncertainty: Rank Sensitivity and Knowledge-Driven Scheduling. Buildings. 2026;16(21):4419. doi:10.3390/buildings16214419
BibTeX
@article{Hu2026,
author = {Hu, Yueqi and Wang, Xianru and Chi, Jiancheng and Wu, Ling},
title = {Multi-UAV Construction Delivery Under Energy Uncertainty: Rank Sensitivity and Knowledge-Driven Scheduling},
journal = {Buildings},
year = {2026},
volume = {16},
number = {21},
pages = {4419},
doi = {10.3390/buildings16214419}
}
EUVIMED