Clash Categorization and Optimization in a Federated BIM Workflow for Integrating Temporary Shoring Systems and Permanent Structures in High-Rise Excavations

Mohammadsoroush Tafazzoli, Sahar Falegari, Ali Akbar Shirzadi Javid

Buildings · 18.08.2026 · 16 (16) · 3290

DOI: 10.3390/buildings16163290 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Buildings, online erschienen am 18.08.2026. Verfasst von Mohammadsoroush Tafazzoli und 2 weiteren Autor:innen. Die Arbeit nennt 29 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The integration of temporary support systems with permanent structural frameworks remains a complex challenge in high-rise construction, where traditional building information modeling (BIM) workflows often lack the coordination needed to optimize both simultaneously. This study addresses that gap through a federated BIM workflow using Tekla Structures, Revit, Navisworks, and Dynamo on a fourteen-story building with a five-level basement. The temporary shoring, permanent concrete frame, and formwork were modeled at Level of Development (LOD) 300–350. A parameter-driven methodology in Dynamo managed large-scale clash detection. Steel cutting-list optimization reduced sheet-cutting waste from 4.5% to below 3% across 18 tons of steel. Clash detection between the truss guard and permanent rebar initially returned over 6000 conflicts; categorizing these via Dynamo made resolution tractable. This data optimized plywood formwork, reducing requirements by 15% (3350 to 2850 square meters), and refined rebar scheduling, recovering 51 of 103 additional tons, 32.8 tons of which are directly attributable to the truss-rebar interaction-zone workflow presented in this study. The study demonstrates that federating temporary and permanent models generates reusable coordination data, yielding savings beyond simple clash avoidance. It offers a transferable workflow for temporary-to-permanent structural integration that the current literature has not yet examined quantitatively.

Zitieren

APA

Tafazzoli, M., Falegari, S., & Javid, A. A. S. (2026). Clash Categorization and Optimization in a Federated BIM Workflow for Integrating Temporary Shoring Systems and Permanent Structures in High-Rise Excavations. Buildings, 16(16), 3290. https://doi.org/10.3390/buildings16163290

Vancouver

Tafazzoli M, Falegari S, Javid AAS. Clash Categorization and Optimization in a Federated BIM Workflow for Integrating Temporary Shoring Systems and Permanent Structures in High-Rise Excavations. Buildings. 2026;16(16):3290. doi:10.3390/buildings16163290

BibTeX
@article{Tafazzoli2026,
  author = {Tafazzoli, Mohammadsoroush and Falegari, Sahar and Javid, Ali Akbar Shirzadi},
  title = {Clash Categorization and Optimization in a Federated BIM Workflow for Integrating Temporary Shoring Systems and Permanent Structures in High-Rise Excavations},
  journal = {Buildings},
  year = {2026},
  volume = {16},
  number = {16},
  pages = {3290},
  doi = {10.3390/buildings16163290}
}
Kostenlos starten →