A Study on the Evaluation of BIM Application Maturity in the Construction Phase of Building Projects Based on AHP-CRITIC and Cloud Models: A Case Study in Xi’an, China
Buildings · 21.07.2026 · 16 (14) · 2899
DOI: 10.3390/buildings16142899 ↗Kurz gefasst
Fachartikel in der Zeitschrift Buildings, online erschienen am 21.07.2026. Verfasst von Ping Cao und 1 weiteren Autor:innen. Die Arbeit nennt 34 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
With the continuous digital transformation of the construction industry, differences in the depth and effectiveness of BIM application during the construction phase of building projects have become increasingly evident. To systematically evaluate BIM application maturity during this stage, this study develops a construction phase-specific maturity assessment framework. First, based on the characteristics of BIM application during the construction phase and the logic of maturity assessment, the concept of BIM application maturity is defined. An evaluation indicator system is then constructed using the Balanced Scorecard as an organising framework, covering four dimensions: financial and cost-effectiveness, customer and delivery value, internal processes and efficiency, and learning and innovation capability. Second, grey relational analysis is used to screen and optimise the initial indicators, while the AHP-CRITIC combined weighting method is adopted to integrate subjective expert judgement and objective data characteristics. On this basis, a cloud model-based evaluation method is introduced to transform qualitative maturity assessment into quantitative evaluation while considering fuzziness and randomness. Finally, the proposed framework is applied to Project C as an empirical case application. The results show that the overall BIM application maturity of Project C during the construction phase is classified as the Integration Level. Among the four first-level dimensions, the customer and delivery value dimension performs relatively strongly, while the learning and innovation capability dimension shows the lowest expectation value. The proposed framework can help identify the maturity level and relative weaknesses of BIM applications during the construction phase, and can provide a reference for targeted BIM improvement and construction management decision-making.
Zitieren
APA
Cao, P., & Wu, Z. (2026). A Study on the Evaluation of BIM Application Maturity in the Construction Phase of Building Projects Based on AHP-CRITIC and Cloud Models: A Case Study in Xi’an, China. Buildings, 16(14), 2899. https://doi.org/10.3390/buildings16142899
Vancouver
Cao P, Wu Z. A Study on the Evaluation of BIM Application Maturity in the Construction Phase of Building Projects Based on AHP-CRITIC and Cloud Models: A Case Study in Xi’an, China. Buildings. 2026;16(14):2899. doi:10.3390/buildings16142899
BibTeX
@article{Cao2026,
author = {Cao, Ping and Wu, Zhencai},
title = {A Study on the Evaluation of BIM Application Maturity in the Construction Phase of Building Projects Based on AHP-CRITIC and Cloud Models: A Case Study in Xi’an, China},
journal = {Buildings},
year = {2026},
volume = {16},
number = {14},
pages = {2899},
doi = {10.3390/buildings16142899}
}
EUVIMED