EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

A Review of Integrated Project Delivery: Expectation Versus Reality

Shoeb Ahmed Memon, Mashitah Mohamad Hanafiah, Wing Chi Tsang, Nor Syamimi Samsudin, Mazlina Zaira Mohammad, Steve Rowlinson

Buildings · 15.07.2026 · 16 (14) · 2810

DOI: 10.3390/buildings16142810 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Buildings, online erschienen am 15.07.2026. Verfasst von Shoeb Ahmed Memon und 5 weiteren Autor:innen. Die Arbeit nennt 67 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Integrated Project Delivery (IPD) is promoted as a collaborative project delivery capable of reducing fragmentation, improving information exchange and supporting sustainable project outcomes. However, the practical implementation of IPD often falls short of the benefits stakeholders expect. This review examines the expectation–reality gap in IPD through a systematic literature review of 56 studies published between 2018 and 2025 and analysed using ATLAS.ti 9. The findings identify 11 expectation clusters and nine reality clusters. The expectation patterns are classified into three broader areas of collaborative practice, commercial and risk management, and governance and delivery, whereas the reality patterns relate to strategic and organisational issues, procedural and relational issues and, lastly, implementation and contractual issues. The discussion shows that IPD should be understood not only as a contractual arrangement but also as a socio-technical and institutional system that requires digital interoperability, trust, aligned objectives, legal readiness, and early stakeholder integration. The paper contributes a pattern–output matrix that links expectation clusters to reality barriers and translates the findings into future research directions for stakeholders.

Zitieren

APA

Memon, S. A., Hanafiah, M. M., Tsang, W. C., Samsudin, N. S., Mohammad, M. Z., & Rowlinson, S. (2026). A Review of Integrated Project Delivery: Expectation Versus Reality. Buildings, 16(14), 2810. https://doi.org/10.3390/buildings16142810

Vancouver

Memon SA, Hanafiah MM, Tsang WC, Samsudin NS, Mohammad MZ, Rowlinson S. A Review of Integrated Project Delivery: Expectation Versus Reality. Buildings. 2026;16(14):2810. doi:10.3390/buildings16142810

BibTeX
@article{Memon2026,
  author = {Memon, Shoeb Ahmed and Hanafiah, Mashitah Mohamad and Tsang, Wing Chi and Samsudin, Nor Syamimi and Mohammad, Mazlina Zaira and Rowlinson, Steve},
  title = {A Review of Integrated Project Delivery: Expectation Versus Reality},
  journal = {Buildings},
  year = {2026},
  volume = {16},
  number = {14},
  pages = {2810},
  doi = {10.3390/buildings16142810}
}
Kostenlos starten →