EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Vision-Based Deformation Monitoring and Risk Analysis of Adjacent High-Speed Railway Piers Under Full Construction Process of New Bridges

Xuena Jia, Liang Xu, Fengkun Cui, Xingyu Wang, Jin Yao

Buildings · 16.06.2026 · 16 (12) · 2393

DOI: 10.3390/buildings16122393 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Buildings, online erschienen am 16.06.2026. Verfasst von Xuena Jia und 4 weiteren Autor:innen. Die Arbeit nennt 36 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Natural Science Foundation of Shandong Province, Teachers’ Visiting and Research Funding of Shandong Provincial Ordinary Undergraduate Universities, State Key Laboratory of Tunnel Engineering.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The extensive development of high-speed railway (HSR) networks often necessitates construction activities adjacent to operational lines. However, existing studies have mostly focused on the substructure construction phase, lacking systematic consideration of cumulative effects throughout the construction process. This study proposes an integrated framework for risk-informed monitoring throughout the full construction process. The framework integrates the Analytic Hierarchy Process (AHP), triangular fuzzy numbers, and fuzzy comprehensive evaluation to construct a quantitative risk assessment model, decomposing the construction process into hierarchical risk factors and quantifying the weights of each factor. Furthermore, a non-contact real-time monitoring system based on Digital Image Correlation (DIC) is designed and deployed, enabling high-frequency, high-precision three-dimensional pier deformation measurement. Applied to a new bridge crossing the Beijing–Shanghai HSR, the risk model identified pile cap and pier construction as the highest-risk stage (weight: 0.311). The DIC system, validated against total station measurements (relative error < 5%), recorded cumulative pier deformations across 31 construction stages, all remaining within the ±1.2 mm early warning threshold, thereby validating the proposed risk assessment model. The integrated AHP-Fuzzy and DIC framework provides a robust paradigm for proactive risk management, confirming that risk-informed monitoring ensures construction impacts on existing HSR infrastructure remain within safe limits.

Förderung

  • Natural Science Foundation of Shandong Province
  • Teachers’ Visiting and Research Funding of Shandong Provincial Ordinary Undergraduate Universities
  • State Key Laboratory of Tunnel Engineering
  • Jiangsu Provincial Young Scientific and Technological Talents Support Program
  • Natural Science Fundamental Research Project of Higher Education Institutions in Jiangsu Province
  • State Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing Jiaotong University
  • Scientific Research Foundation of Suzhou University of Science and Technology

Zitieren

APA

Jia, X., Xu, L., Cui, F., Wang, X., & Yao, J. (2026). Vision-Based Deformation Monitoring and Risk Analysis of Adjacent High-Speed Railway Piers Under Full Construction Process of New Bridges. Buildings, 16(12), 2393. https://doi.org/10.3390/buildings16122393

Vancouver

Jia X, Xu L, Cui F, Wang X, Yao J. Vision-Based Deformation Monitoring and Risk Analysis of Adjacent High-Speed Railway Piers Under Full Construction Process of New Bridges. Buildings. 2026;16(12):2393. doi:10.3390/buildings16122393

BibTeX
@article{Jia2026,
  author = {Jia, Xuena and Xu, Liang and Cui, Fengkun and Wang, Xingyu and Yao, Jin},
  title = {Vision-Based Deformation Monitoring and Risk Analysis of Adjacent High-Speed Railway Piers Under Full Construction Process of New Bridges},
  journal = {Buildings},
  year = {2026},
  volume = {16},
  number = {12},
  pages = {2393},
  doi = {10.3390/buildings16122393}
}
Kostenlos starten →