BIM-Integrated Multi-Objective Optimisation of Prefabricated Construction Configurations: A WBS-Based Generative Decomposition Framework
Buildings · 14.06.2026 · 16 (12) · 2373
DOI: 10.3390/buildings16122373 ↗Kurz gefasst
Fachartikel in der Zeitschrift Buildings, online erschienen am 14.06.2026. Verfasst von Sepehr Abrishami und 1 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref) und nennt 38 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
Building Information Modelling (BIM) workflows for prefabricated construction lack mechanisms that generate and compare alternative component configurations directly from a design model. Existing approaches define the optimisation search space manually and outside the model, address only one or two criteria, and treat the Work Breakdown Structure (WBS) as a post-design planning tool. This paper reinterprets the WBS as a generative decomposition mechanism. A WBS Engine decomposes the geometry of an existing BIM model into prefabricated subsystems before design decisions are fixed, producing the search space for optimisation without manual parametrisation. A Scenario Evaluator queries a database of 47 prefabricated components, and NSGA-II evaluates 60 configurations against four objectives. These are total cost, embodied carbon, assembly factor and number of lorry trips. Applied to a residential case study implemented in Dynamo, the prototype identified 16 non-dominated solutions. The best compromise configuration achieved a total cost of £150,444.01, 127,731.00 kgCO2e, an assembly factor of 0.190 and 10 lorry trips. Wall module size accounted for 17.4% of cost variation, while floor module size governed assembly complexity. The findings show that BIM-WBS integration with multi-objective optimisation supports informed early-stage decisions in industrialised construction.
Zitieren
APA
Abrishami, S., & Boada, M. R. (2026). BIM-Integrated Multi-Objective Optimisation of Prefabricated Construction Configurations: A WBS-Based Generative Decomposition Framework. Buildings, 16(12), 2373. https://doi.org/10.3390/buildings16122373
Vancouver
Abrishami S, Boada MR. BIM-Integrated Multi-Objective Optimisation of Prefabricated Construction Configurations: A WBS-Based Generative Decomposition Framework. Buildings. 2026;16(12):2373. doi:10.3390/buildings16122373
BibTeX
@article{Abrishami2026,
author = {Abrishami, Sepehr and Boada, Mayerlin Ramos},
title = {BIM-Integrated Multi-Objective Optimisation of Prefabricated Construction Configurations: A WBS-Based Generative Decomposition Framework},
journal = {Buildings},
year = {2026},
volume = {16},
number = {12},
pages = {2373},
doi = {10.3390/buildings16122373}
}
EUVIMED