Project Performance Comparison of United States P3 Building Projects with DB and DBB Building Projects
Buildings · 13.05.2026 · 16 (10) · 1930
DOI: 10.3390/buildings16101930 ↗Kurz gefasst
Fachartikel in der Zeitschrift Buildings, online erschienen am 13.05.2026. Verfasst von Pramen P. Shrestha und 2 weiteren Autor:innen. Die Arbeit nennt 27 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: University of Nevada, Las Vegas.
Abstract (Originalsprache)
Public building projects in the United States continue to face challenges related to cost escalation and schedule delays, prompting increased interest in alternative project delivery methods. Although Design–Bid–Build (DBB) remains the most commonly used approach, Design–Build (DB) and Public–Private Partnership (P3) delivery methods are increasingly adopted with the expectation of improved project performance. This study uses three statistical tests to determine whether three performance metrics related to the cost and schedule of U.S. building projects delivered using P3, DB, and DBB are significantly different. Before conducting this test, project costs were adjusted to constant 2025 dollars using the RS Means City Cost Index to account for differences in completion years. On average, all three test results indicate that P3 projects’ cost growth (−2.61%) is significantly lower than that of DB (7.95%) and DBB (24.40%). Similarly, the schedule growth of P3 projects (−2.51%) was significantly lower than that of DB (2.65%) and DBB (27.09%). However, no statistically significant difference in the schedule was observed between DB and DBB. Differences in construction intensity were not statistically significant. These findings provide quantitative insight for owners when selecting delivery methods for building projects.
Förderung
- University of Nevada, Las Vegas
Zitieren
APA
Shrestha, P. P., Shrestha, B., & Basnet, P. (2026). Project Performance Comparison of United States P3 Building Projects with DB and DBB Building Projects. Buildings, 16(10), 1930. https://doi.org/10.3390/buildings16101930
Vancouver
Shrestha PP, Shrestha B, Basnet P. Project Performance Comparison of United States P3 Building Projects with DB and DBB Building Projects. Buildings. 2026;16(10):1930. doi:10.3390/buildings16101930
BibTeX
@article{Shrestha2026,
author = {Shrestha, Pramen P. and Shrestha, Bandana and Basnet, Pooja},
title = {Project Performance Comparison of United States P3 Building Projects with DB and DBB Building Projects},
journal = {Buildings},
year = {2026},
volume = {16},
number = {10},
pages = {1930},
doi = {10.3390/buildings16101930}
}
EUVIMED