EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Study on Maximum Vertical Prestressing Spacing for Long-Span PC Continuous Rigid-Frame Bridges

Fei Xia, Shenxin Zhang, Yasir Ibrahim Shah

Buildings · 30.03.2026 · 16 (7) · 1363

DOI: 10.3390/buildings16071363 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Buildings, online erschienen am 30.03.2026. Verfasst von Fei Xia und 2 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref) und nennt 47 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Vertical prestressing is critical for shear resistance in long-span PC continuous rigid-frame bridges, yet existing design methods rely on the inaccurate superposition of single-tendon stress fields, neglecting mechanical interaction between adjacent tendons. This study derives the first closed-form elastic analytical solution for the vertical normal stress field under two interacting prestressing tendons, explicitly capturing the coupling term. Validated against high-fidelity Finite Element Analysis (FEA), the solution achieves a Mean Absolute Percentage Error (MAPE) below 6.8%, outperforming conventional superposition methods by 6.8–17.7 percentage points. The analysis reveals a transition from diffusion-dominated to superposition-dominated stress regimes and establishes a predictive linear relationship between tendon spacing and the depth of the prestressing blind zone. The section at one-fourth of the web height below the top edge is identified as the critical control section, leading to a proposed maximum spacing limit of 0.34 times the web height to ensure a stress uniformity coefficient greater than 0.95. This criterion represents a 13.3% increase over empirical rules and a 27.5% increase over the JTG 3362-2018 limit, enabling estimated savings of 52,000 CNY per typical four-span bridge while maintaining structural safety. This represents a 13.3% increase over empirical rules and a 27.5% increase over the limit in JTG 3362-2018, enabling estimated savings of 52,000 CNY per typical four-span bridge while maintaining structural safety.

Zitieren

APA

Xia, F., Zhang, S., & Shah, Y. I. (2026). Study on Maximum Vertical Prestressing Spacing for Long-Span PC Continuous Rigid-Frame Bridges. Buildings, 16(7), 1363. https://doi.org/10.3390/buildings16071363

Vancouver

Xia F, Zhang S, Shah YI. Study on Maximum Vertical Prestressing Spacing for Long-Span PC Continuous Rigid-Frame Bridges. Buildings. 2026;16(7):1363. doi:10.3390/buildings16071363

BibTeX
@article{Xia2026,
  author = {Xia, Fei and Zhang, Shenxin and Shah, Yasir Ibrahim},
  title = {Study on Maximum Vertical Prestressing Spacing for Long-Span PC Continuous Rigid-Frame Bridges},
  journal = {Buildings},
  year = {2026},
  volume = {16},
  number = {7},
  pages = {1363},
  doi = {10.3390/buildings16071363}
}
Kostenlos starten →