Wind Energy Development on Lake Huron: Optimization of Guyed-Tower Foundation Design
Buildings · 10.03.2026 · 16 (6) · 1100
DOI: 10.3390/buildings16061100 ↗Kurz gefasst
Fachartikel in der Zeitschrift Buildings, online erschienen am 10.03.2026. Verfasst von Yusuff Ridwan und 1 weiteren Autor:innen. Die Arbeit nennt 11 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
The accelerating development of offshore wind energy in the Great Lakes region necessitates cost-effective solutions for auxiliary infrastructure, such as meteorological masts. While monopile foundations are well-established for turbine generators, their high flexural rigidity and capital cost are often disproportionate for non-generating platforms. This study presents a parametric optimization of a guyed tower foundation situated in the nearshore limestone shelf of Lake Huron (Point Clark), specifically designed to balance strict signal serviceability with foundation economy. Using a non-linear static solver with Ernst equivalent cable moduli, a full factorial sweep of 48 design configurations was conducted under site-specific hydrodynamic loads (1300 kN Average/3500 kN Storm). The results demonstrate that while all configurations satisfied the 0.004 rad rotation limit mandated by TIA-222-H, significant non-linear trade-offs exist between structural stiffness and foundation demand. Specifically, a “cost of rigidity” was identified, where increasing cable pretension to 800 kN resulted in foundation overturning moments exceeding 9.6 × 104 kN·m—a threefold increase compared to lower-pretension alternatives. To resolve this trade-off, a formal multi-objective scoring function was applied to rank designs based on rotation, moment, and displacement. The analysis identifies a “balanced” configuration comprising three guys with high-stiffness anchors (5 × 107 N/m) and moderate pretension (300–500 kN) as the optimal design. This configuration leverages the competent bedrock to minimize cable tension requirements, offering a resilient and economically efficient solution for Great Lakes offshore monitoring.
Zitieren
APA
Ridwan, Y., & Yin, S. (2026). Wind Energy Development on Lake Huron: Optimization of Guyed-Tower Foundation Design. Buildings, 16(6), 1100. https://doi.org/10.3390/buildings16061100
Vancouver
Ridwan Y, Yin S. Wind Energy Development on Lake Huron: Optimization of Guyed-Tower Foundation Design. Buildings. 2026;16(6):1100. doi:10.3390/buildings16061100
BibTeX
@article{Ridwan2026,
author = {Ridwan, Yusuff and Yin, Shunde},
title = {Wind Energy Development on Lake Huron: Optimization of Guyed-Tower Foundation Design},
journal = {Buildings},
year = {2026},
volume = {16},
number = {6},
pages = {1100},
doi = {10.3390/buildings16061100}
}
EUVIMED