EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

A Method for Forming New-Type Construction Project Management Teams Using CSCD-NSGA-II

Qing’e Wang, Zhuo Wang, Zhongdong Cui, Yufei Lu

Buildings · 16.02.2026 · 16 (4) · 816

DOI: 10.3390/buildings16040816 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Buildings, online erschienen am 16.02.2026. Verfasst von Qing’e Wang und 3 weiteren Autor:innen. Die Arbeit wurde bisher 2-mal zitiert (Crossref) und nennt 79 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Natural Science Foundation of China, Natural Science Foundation of Hunan Province.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

As intelligent construction technology advances, new projects have become more technology-intensive, collaborative, and multi-objective. Traditional team formation methods based on people’s experience can no longer meet their complex management needs. This study reframes team formation as a multi-objective optimization problem to maximize person–job fit and team collaboration. By introducing a hierarchical penalty mechanism for structured resumes and performing semantic feature extraction on unstructured text via the BERT-base-Chinese model, we develop a job competency model, quantify person–job fit with cosine similarity, and assess team collaboration through MBTI theory and a project-specific scoring framework. An improved algorithm, CSCD-NSGA-II, is proposed, which combines K-means clustering and a modified crowding distance, to maintain solution diversity under constraints. It improves HV by 1.55% and reduces SP by 10.81% compared to the standard NSGA-II. Validation using real projects, simulated data, and algorithm comparisons demonstrates that CSCD-NSGA-II generates teams more efficiently than manual methods. Survey results indicate improved role diversity and the feasibility of collaboration, along with similar task adaptability. The algorithm also outperforms NSGA-II, MOPSO, and SPEA2, supporting intelligent team formation in modern construction.

Förderung

  • National Natural Science Foundation of China
  • Natural Science Foundation of Hunan Province

Zitieren

APA

Wang, Q., Wang, Z., Cui, Z., & Lu, Y. (2026). A Method for Forming New-Type Construction Project Management Teams Using CSCD-NSGA-II. Buildings, 16(4), 816. https://doi.org/10.3390/buildings16040816

Vancouver

Wang Q, Wang Z, Cui Z, Lu Y. A Method for Forming New-Type Construction Project Management Teams Using CSCD-NSGA-II. Buildings. 2026;16(4):816. doi:10.3390/buildings16040816

BibTeX
@article{Wang2026,
  author = {Wang, Qing’e and Wang, Zhuo and Cui, Zhongdong and Lu, Yufei},
  title = {A Method for Forming New-Type Construction Project Management Teams Using CSCD-NSGA-II},
  journal = {Buildings},
  year = {2026},
  volume = {16},
  number = {4},
  pages = {816},
  doi = {10.3390/buildings16040816}
}
Kostenlos starten →