AI-Powered Forecasting of Environmental Impacts and Construction Costs to Enhance Project Management in Highway Projects
Buildings · 19.07.2025 · 15 (14) · 2546
DOI: 10.3390/buildings15142546 ↗Kurz gefasst
Fachartikel in der Zeitschrift Buildings, online erschienen am 19.07.2025. Verfasst von Joon-Soo Kim. Die Arbeit wurde bisher 9-mal zitiert (Crossref) und nennt 28 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Basic Science Research Program through the National Research Foundation of Korea (NRF).
Abstract (Originalsprache)
The accurate early-stage estimation of environmental load (EL) and construction cost (CC) in road infrastructure projects remains a significant challenge, constrained by limited data and the complexity of construction activities. To address this, our study proposes a machine learning-based predictive framework utilizing artificial neural networks (ANNs) and deep neural networks (DNNs), enhanced by autoencoder-driven feature selection. A structured dataset of 150 completed national road projects in South Korea was compiled, covering both planning and design phases. The database focused on 19 high-impact sub-work types to reduce noise and improve prediction precision. A hybrid imputation approach—combining mean substitution with random forest regression—was applied to handle 4.47% missing data in the design-phase inputs, reducing variance by up to 5% and improving data stability. Dimensionality reduction via autoencoder retained 16 core variables, preserving 97% of explanatory power while minimizing redundancy. ANN models benefited from cross-validation and hyperparameter tuning, achieving consistent performance across training and validation sets without overfitting (MSE = 0.06, RMSE = 0.24). The optimal ANN yielded average error rates of 29.8% for EL and 21.0% for CC at the design stage. DNN models, with their deeper architectures and dropout regularization, further improved performance—achieving 27.1% (EL) and 17.0% (CC) average error rates at the planning stage and 24.0% (EL) and 14.6% (CC) at the design stage. These results met all predefined accuracy thresholds, underscoring the DNN’s advantage in handling complex, high-variance data while the ANN excelled in structured cost prediction. Overall, the synergy between deep learning and autoencoder-based feature selection offers a scalable and data-informed approach for enhancing early-stage environmental and economic assessments in road infrastructure planning—supporting more sustainable and efficient project management.
Förderung
- Basic Science Research Program through the National Research Foundation of Korea (NRF)
Zitieren
APA
Kim, J. (2025). AI-Powered Forecasting of Environmental Impacts and Construction Costs to Enhance Project Management in Highway Projects. Buildings, 15(14), 2546. https://doi.org/10.3390/buildings15142546
Vancouver
Kim J. AI-Powered Forecasting of Environmental Impacts and Construction Costs to Enhance Project Management in Highway Projects. Buildings. 2025;15(14):2546. doi:10.3390/buildings15142546
BibTeX
@article{Kim2025,
author = {Kim, Joon-Soo},
title = {AI-Powered Forecasting of Environmental Impacts and Construction Costs to Enhance Project Management in Highway Projects},
journal = {Buildings},
year = {2025},
volume = {15},
number = {14},
pages = {2546},
doi = {10.3390/buildings15142546}
}
EUVIMED