BIM-Based Automatic Extraction of Daily Concrete and Formwork Requirements for Site Work Planning

Van-Hoan Pham, Po-Han Chen, Quan Nguyen, Diep-Thuy Duong

Buildings · 18.12.2024 · 14 (12) · 4021

DOI: 10.3390/buildings14124021 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Buildings, online erschienen am 18.12.2024. Verfasst von Van-Hoan Pham und 3 weiteren Autor:innen. Die Arbeit wurde bisher 11-mal zitiert (Crossref) und nennt 53 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Material planning is important in construction, for it affects procurement, cost, and schedule. Proper planning of material supply and logistics helps streamline the performance of all tasks through the avoidance of excessive or insufficient material supply. Material planning relies on quantity takeoff (QTO) and project schedules. Conventionally, quantity takeoff was a manual process based on 2D drawings and human interpretation and was error-prone. Presently, with the popularity of Building Information Modelling (BIM), in BIM-based projects, using inbuilt quantity takeoff functions, quantities of work can be generated automatically from BIM models to aid the quantity takeoff. However, if those inbuilt QTO solutions are object-based, then the quantities of works extracted may not meet the requirements of the users in selected cases, e.g., in zone-based construction projects. Also, for estimating daily material requirements, the accuracy of the quantities of work becomes more important, not only for the purpose of efficient planning but also for reducing construction waste. Since works using the same type of material can go overlapping, in addition to estimating the amount of material for each work, the total amount of material for a day must also be calculated. Thus, this research aims to develop a framework for automatic extraction of zone-based concrete volumes and formwork positions for cast-in-place concrete structures using the data in BIM models, followed by linking them with project schedules for estimating daily concrete and formwork requirements. This framework extends the body of knowledge by introducing an innovative algorithm for automatically calculating overlapped areas between concrete members and a rule for naming tasks in the schedule, followed by evaluating the formwork requirements without drawing formwork in a 3D model. A software tool will be developed to achieve the aim, and a case study will be used to validate the proposed framework.

Zitieren

APA

Pham, V., Chen, P., Nguyen, Q., & Duong, D. (2024). BIM-Based Automatic Extraction of Daily Concrete and Formwork Requirements for Site Work Planning. Buildings, 14(12), 4021. https://doi.org/10.3390/buildings14124021

Vancouver

Pham V, Chen P, Nguyen Q, Duong D. BIM-Based Automatic Extraction of Daily Concrete and Formwork Requirements for Site Work Planning. Buildings. 2024;14(12):4021. doi:10.3390/buildings14124021

BibTeX
@article{Pham2024,
  author = {Pham, Van-Hoan and Chen, Po-Han and Nguyen, Quan and Duong, Diep-Thuy},
  title = {BIM-Based Automatic Extraction of Daily Concrete and Formwork Requirements for Site Work Planning},
  journal = {Buildings},
  year = {2024},
  volume = {14},
  number = {12},
  pages = {4021},
  doi = {10.3390/buildings14124021}
}
Kostenlos starten →