EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Improved Building Information Modeling Based Method for Prioritizing Clash Detection in the Building Construction Design Phase

Iman Bitaraf, Ali Salimpour, Pedram Elmi, Ali Akbar Shirzadi Javid

Buildings · 13.11.2024 · 14 (11) · 3611

DOI: 10.3390/buildings14113611 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Buildings, online erschienen am 13.11.2024. Verfasst von Iman Bitaraf und 3 weiteren Autor:innen. Die Arbeit wurde bisher 18-mal zitiert (Crossref) und nennt 27 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The rising complexity of construction projects and the industry’s commitment to sustainable practices have driven the extensive adoption of Building Information Modeling (BIM) technology. A core function of BIM is the early identification and resolution of clashes during the design phase, which serves to mitigate costly rework and delays in the construction process. This study presents an advanced method for classifying and prioritizing hard clashes between structural components and mechanical, electrical, and plumbing (MEP) systems. Employing the Best-Worst Method (BWM), this research assigned specific weights to structural and MEP elements based on expert evaluations. Six parameters were incorporated into this prioritization framework: the weights determined by the BWM, outputs from Navisworks software (v2021), the ratio of MEP volume to floor volume, the functional purpose of each floor, and the number of adjacent elements. A custom-developed plugin for Autodesk Navisworks integrated these parameters, enabling real-time automated clash prioritization. Clashes were ranked by criticality through a calculation involving the six parameters, which enhanced the efficiency of clash detection by optimizing time and cost considerations during the design phase. Case study results indicate that beams and columns represent the most critical structural elements, while ducts are identified as the most significant MEP elements. The proposed method substantially improves clash detection and prioritization efficiency and accuracy, yielding considerable benefits in project management and resource allocation.

Zitieren

APA

Bitaraf, I., Salimpour, A., Elmi, P., & Javid, A. A. S. (2024). Improved Building Information Modeling Based Method for Prioritizing Clash Detection in the Building Construction Design Phase. Buildings, 14(11), 3611. https://doi.org/10.3390/buildings14113611

Vancouver

Bitaraf I, Salimpour A, Elmi P, Javid AAS. Improved Building Information Modeling Based Method for Prioritizing Clash Detection in the Building Construction Design Phase. Buildings. 2024;14(11):3611. doi:10.3390/buildings14113611

BibTeX
@article{Bitaraf2024,
  author = {Bitaraf, Iman and Salimpour, Ali and Elmi, Pedram and Javid, Ali Akbar Shirzadi},
  title = {Improved Building Information Modeling Based Method for Prioritizing Clash Detection in the Building Construction Design Phase},
  journal = {Buildings},
  year = {2024},
  volume = {14},
  number = {11},
  pages = {3611},
  doi = {10.3390/buildings14113611}
}
Kostenlos starten →