EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Digital Management Methodology for Building Production Optimization through Digital Twin and Artificial Intelligence Integration

Giuseppe Piras, Francesco Muzi, Virginia Adele Tiburcio

Buildings · 10.07.2024 · 14 (7) · 2110

DOI: 10.3390/buildings14072110 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Buildings, online erschienen am 10.07.2024. Verfasst von Giuseppe Piras und 2 weiteren Autor:innen. Die Arbeit wurde bisher 83-mal zitiert (Crossref) und nennt 70 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

In a construction project schedule, delays in delivery are one of the most important problems. Delays can be caused by several project components; however, the issue is amplified when delays occur simultaneously. Classifying delays is relevant in order to allocate responsibility to the parties. In Italy, the delay in the delivery of medium and large-sized works in residential urban centers is about 15% compared to the project forecast. Moreover, the AECO sector’s ability to adapt to emerging challenges, such as environmental sustainability and digitization, is limited by the lack of innovation in management methods. The aim of this research is to create a methodology for managing the built and to-be-built environment in a digital way. This will optimize the building process by reducing delays and waste of resources. The methodology will use tools such as digital twin (DT), Building Information Modeling (BIM), Internet of Things (IoT), and Artificial Intelligence (AI) algorithms. The integration of lean construction practices can make the use of these technologies even more efficient, supporting better workflow management by using the BIM environment. The paper presents a methodology that can be applied to various scaling factors and scenarios. It is also useful for construction sites that are already in progress. As highlighted below, this brings significant economic-temporal advantages.

Zitieren

APA

Piras, G., Muzi, F., & Tiburcio, V. A. (2024). Digital Management Methodology for Building Production Optimization through Digital Twin and Artificial Intelligence Integration. Buildings, 14(7), 2110. https://doi.org/10.3390/buildings14072110

Vancouver

Piras G, Muzi F, Tiburcio VA. Digital Management Methodology for Building Production Optimization through Digital Twin and Artificial Intelligence Integration. Buildings. 2024;14(7):2110. doi:10.3390/buildings14072110

BibTeX
@article{Piras2024,
  author = {Piras, Giuseppe and Muzi, Francesco and Tiburcio, Virginia Adele},
  title = {Digital Management Methodology for Building Production Optimization through Digital Twin and Artificial Intelligence Integration},
  journal = {Buildings},
  year = {2024},
  volume = {14},
  number = {7},
  pages = {2110},
  doi = {10.3390/buildings14072110}
}
Kostenlos starten →