EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Collaborative BIM-Based Construction Coordination Progress Modeling Using Extended Collaborative Process Modeling (exCPM)

Jae-Hyung Shim, Nam-Hyuk Ham, Jae-Jun Kim

Buildings · 28.01.2024 · 14 (2) · 358

DOI: 10.3390/buildings14020358 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Buildings, online erschienen am 28.01.2024. Verfasst von Jae-Hyung Shim und 2 weiteren Autor:innen. Die Arbeit wurde bisher 15-mal zitiert (Crossref) und nennt 59 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Research Foundation of Korea (NRF) grant funded by the Korea government (MSIT).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Agile project management pursues repetitive and continuous management through an empirical process control method considering the complexity of the project. This study aimed to propose a collaborative Building Information Modeling (BIM)-based work process, focusing on construction coordination tasks among participants during the construction phase of a project. The theoretical framework chosen for this endeavor was the Scrum framework, selected after analyzing previous research to align with the specific characteristics of construction coordination. Using the Scrum framework as a foundation, the study employed the exCPM methodology to model the collaborative BIM-based construction coordination progress. To validate the model, it underwent a transformation into a Petri-Nets model through the marked graph building block (MGBB) along with established rules for model conversion. The converted model was then subjected to validation through reachability tree analysis. The findings of this study hold applicability to diverse collaboration processes that leverage BIM in the construction industry.

Förderung

  • National Research Foundation of Korea (NRF) grant funded by the Korea government (MSIT)

Zitieren

APA

Shim, J., Ham, N., & Kim, J. (2024). Collaborative BIM-Based Construction Coordination Progress Modeling Using Extended Collaborative Process Modeling (exCPM). Buildings, 14(2), 358. https://doi.org/10.3390/buildings14020358

Vancouver

Shim J, Ham N, Kim J. Collaborative BIM-Based Construction Coordination Progress Modeling Using Extended Collaborative Process Modeling (exCPM). Buildings. 2024;14(2):358. doi:10.3390/buildings14020358

BibTeX
@article{Shim2024,
  author = {Shim, Jae-Hyung and Ham, Nam-Hyuk and Kim, Jae-Jun},
  title = {Collaborative BIM-Based Construction Coordination Progress Modeling Using Extended Collaborative Process Modeling (exCPM)},
  journal = {Buildings},
  year = {2024},
  volume = {14},
  number = {2},
  pages = {358},
  doi = {10.3390/buildings14020358}
}
Kostenlos starten →