Integrated Production and Transport Scheduling in Flexible Job Shops with Automated Guided Vehicles
Applied Sciences · 20.11.2026 · 16 (22) · 11519
DOI: 10.3390/app162211519 ↗Kurz gefasst
Fachartikel in der Zeitschrift Applied Sciences, online erschienen am 20.11.2026. Verfasst von Congzhe Zhao und 3 weiteren Autor:innen. Die Arbeit nennt 55 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Natural Science Foundation of Shandong Province.
Abstract (Originalsprache)
In recent years, automated guided vehicles (AGVs) have been increasingly used in flexible manufacturing. However, battery charging and route conflicts complicate the coordination of processing and transportation. Therefore, a bi-objective scheduling model is formulated to minimize makespan and total AGV energy consumption under battery and traffic conflict constraints. An energy- and conflict-aware nondominated sorting genetic algorithm II (ECA-NSGA-II) is proposed, with a joint decoder that propagates transport, charging, and conflict-related delays to subsequent processing operations. Predictive charging determines charging actions using short-term transport demand and additional delay. Moreover, bottleneck-adaptive critical-task local search combines resource bottleneck diagnosis with Pareto-front positions to guide neighborhood search. Experiments compared six algorithms on 10 synthetic instances, with 10 independent runs per algorithm and instance. Under the common generation limits for each size group, ECA-NSGA-II achieved the highest mean hypervolume on eight instances and the lowest mean inverted generational distance on seven. These results suggest competitive optimization performance on the tested instances under the adopted experimental setting. Ablation results show how predictive charging and local search affect front quality. A traffic diagnostic report recorded unresolved conflicts when conflict resolution is disabled.
Förderung
- Natural Science Foundation of Shandong Province
Zitieren
APA
Zhao, C., Chi, C., Li, Q., & Wang, Q. (2026). Integrated Production and Transport Scheduling in Flexible Job Shops with Automated Guided Vehicles. Applied Sciences, 16(22), 11519. https://doi.org/10.3390/app162211519
Vancouver
Zhao C, Chi C, Li Q, Wang Q. Integrated Production and Transport Scheduling in Flexible Job Shops with Automated Guided Vehicles. Applied Sciences. 2026;16(22):11519. doi:10.3390/app162211519
BibTeX
@article{Zhao2026,
author = {Zhao, Congzhe and Chi, Cheng and Li, Qi and Wang, Quanjing},
title = {Integrated Production and Transport Scheduling in Flexible Job Shops with Automated Guided Vehicles},
journal = {Applied Sciences},
year = {2026},
volume = {16},
number = {22},
pages = {11519},
doi = {10.3390/app162211519}
}
EUVIMED