EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Simulation of the Interaction Process of a Typical Loess Landslide and River Terrace Deposit Using the Two-Phase Material Point Method

Denghai Liu, Jianchao Chen, Wei Shen, Ping Li, Tonglu Li, Tingkai Nian

Applied Sciences · 16.11.2026 · 16 (22) · 11361

DOI: 10.3390/app162211361 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Applied Sciences, online erschienen am 16.11.2026. Verfasst von Denghai Liu und 5 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Natural Science Foundation of China, Fundamental Research Funds for the Central Universities, Chang'an University, 2023 Transportation Scientific Research Project of Shaanxi Provincial Department of Transportation.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Landslide–terrace deposit interaction is a dominant phenomenon in some rapid loess landslides, shaping the final morphology and determining the mobility of the landslide. To investigate this interaction, we simulated the post-failure dynamic process of the Ximiaodian landslide in Shaanxi, China, using a two-phase material point model. The loess mass was modeled as a single-phase elastoplastic material, and the saturated terrace deposit via independent solid and water points. The results show that the landslide movement lasts ~20 s, producing a final terrace material uplift of ~3.5 m, consistent with measured topographic profiles. The peak mean velocity of the terrace lags the loess mass by 4.5 s, with both peak velocity and final displacement decreasing downstream. Near the slope toe, the terrace surface advances ~100 m versus 31 m at its base, demonstrating pronounced internal shear. Frontal terrace uplift decreases from ~6.0 to 3.5 m during propagation while the distal terrace remains largely undisturbed. Furthermore, pore water bears most of the total-stress increment during loading, followed by dissipation under nearly constant total stress. Under the progressive pushing and overriding of the landslide, this stress evolution of the terrace material may contribute to the final long run-out morphology of this landslide.

Förderung

  • National Natural Science Foundation of China
  • Fundamental Research Funds for the Central Universities, Chang'an University
  • 2023 Transportation Scientific Research Project of Shaanxi Provincial Department of Transportation
  • Northwest Engineering Corporation Limited

Zitieren

APA

Liu, D., Chen, J., Shen, W., Li, P., Li, T., & Nian, T. (2026). Simulation of the Interaction Process of a Typical Loess Landslide and River Terrace Deposit Using the Two-Phase Material Point Method. Applied Sciences, 16(22), 11361. https://doi.org/10.3390/app162211361

Vancouver

Liu D, Chen J, Shen W, Li P, Li T, Nian T. Simulation of the Interaction Process of a Typical Loess Landslide and River Terrace Deposit Using the Two-Phase Material Point Method. Applied Sciences. 2026;16(22):11361. doi:10.3390/app162211361

BibTeX
@article{Liu2026,
  author = {Liu, Denghai and Chen, Jianchao and Shen, Wei and Li, Ping and Li, Tonglu and Nian, Tingkai},
  title = {Simulation of the Interaction Process of a Typical Loess Landslide and River Terrace Deposit Using the Two-Phase Material Point Method},
  journal = {Applied Sciences},
  year = {2026},
  volume = {16},
  number = {22},
  pages = {11361},
  doi = {10.3390/app162211361}
}
Kostenlos starten →