The Evolution of External Water Pressure in Karst Tunnels Under Blockage of a New-Type Drainage System
Applied Sciences · 13.11.2026 · 16 (22) · 11245
DOI: 10.3390/app162211245 ↗Kurz gefasst
Fachartikel in der Zeitschrift Applied Sciences, online erschienen am 13.11.2026. Verfasst von Jinbiao Lu und 6 weiteren Autor:innen. Die Arbeit nennt 38 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Chongqing Construction Technology Plan Project.
Abstract (Originalsprache)
Water-rich karst tunnels frequently face the challenge of drainage system blockage. Inadequate drainage can cause a sharp increase in the water pressure outside the lining, resulting in concrete cracking and other structural failure problems. Using the water-rich section of a karst tunnel in Chongqing as an engineering case, this study proposes a new drainage system that combines wide and narrow drainage boards. Field tests on asymmetric drainage blockage were conducted to investigate the dynamic evolution of the external water pressure on the lining under different blockage lengths. A numerical model of the tunnel drainage system was then developed. Blockage scenarios were defined using an equivalent-permeability-based blockage degree to examine the external water pressure response and optimize the drainage board design. The field test results showed that the period 2~4 h after blockage initiation was the main stage of external water pressure buildup. As blockage length increased, water pressures on the two sides of the lining increased asymmetrically. Under the adopted model conditions and permeability degradation relationship, external water pressure increased markedly at selected key locations between the 25% and 50% blockage cases, indicating a substantial loss of pressure relief. Based on the circumferential and longitudinal distributions of water pressure at different blockage degrees, a combination of wide drainage boards (2 m) and narrow drainage boards (1.6 m) is recommended as the optimal design combination. The proposed combination of wide and narrow drainage boards and its optimized parameters can serve as a reference for the design of drainage systems in similar water-rich karst tunnels.
Förderung
- Chongqing Construction Technology Plan Project
Zitieren
APA
Lu, J., Zhong, Z., Duan, X., Yuan, F., Wang, S., Xu, H., & Li, X. (2026). The Evolution of External Water Pressure in Karst Tunnels Under Blockage of a New-Type Drainage System. Applied Sciences, 16(22), 11245. https://doi.org/10.3390/app162211245
Vancouver
Lu J, Zhong Z, Duan X, Yuan F, Wang S, Xu H, et al. The Evolution of External Water Pressure in Karst Tunnels Under Blockage of a New-Type Drainage System. Applied Sciences. 2026;16(22):11245. doi:10.3390/app162211245
BibTeX
@article{Lu2026,
author = {Lu, Jinbiao and Zhong, Zuliang and Duan, Xintong and Yuan, Feng and Wang, Sen and Xu, Hailong and Li, Xiaoyong},
title = {The Evolution of External Water Pressure in Karst Tunnels Under Blockage of a New-Type Drainage System},
journal = {Applied Sciences},
year = {2026},
volume = {16},
number = {22},
pages = {11245},
doi = {10.3390/app162211245}
}