Mechanical Behavior and Stability Analysis of Underground Excavation Construction: Case Study of Large-Span and Variable Cross-Section Subway Crossover Tunnel

Lei Li, Tao Lei, Mingye Wang, Weizheng Liu, Weihua Lu, Guiyong Liu

Applied Sciences · 17.09.2026 · 16 (18) · 9230

DOI: 10.3390/app16189230 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Applied Sciences, online erschienen am 17.09.2026. Verfasst von Lei Li und 5 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref) und nennt 40 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Open Foundation of National Engineering Research Center of High-Speed Railway Construction Technology, Hunan Construction Science and Technology Plan Project.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This paper presents a case study on the deformation characteristics and stress evolution of a large-span variable cross-section crossover tunnel excavated by the mining method. Three construction alternatives are compared: Scheme 1 adopts staggered excavation of twin tunnels with transverse passages, Scheme 2 adopts sequential excavation of twin tunnels with transverse passages, and Scheme 3 adopts gradual expansion excavation without transverse passages. Quantitative comparison shows that: (1) schemes with transverse passages reduce sudden rock deformation by 21.7% compared with Scheme 3; (2) Scheme 1 reduces construction steps by 16 compared with Scheme 2, with only 0.14 mm difference in maximum ground settlement (within engineering tolerance); (3) grouting reinforcement of the middle rock wall reduces surrounding rock deformation by 21.7% and plastic zone width by 18.3%. The recommended temporary support removal length is 5–10 m, which ensures that the incremental vault settlement during removal is controlled within 2 mm, meeting the regional engineering safety standards. Field monitoring results of Scheme 1 show that all deformation indices meet the control requirements. This construction technology can be extended to similar subway crossover projects.

Förderung

  • Open Foundation of National Engineering Research Center of High-Speed Railway Construction Technology
  • Hunan Construction Science and Technology Plan Project

Zitieren

APA

Li, L., Lei, T., Wang, M., Liu, W., Lu, W., & Liu, G. (2026). Mechanical Behavior and Stability Analysis of Underground Excavation Construction: Case Study of Large-Span and Variable Cross-Section Subway Crossover Tunnel. Applied Sciences, 16(18), 9230. https://doi.org/10.3390/app16189230

Vancouver

Li L, Lei T, Wang M, Liu W, Lu W, Liu G. Mechanical Behavior and Stability Analysis of Underground Excavation Construction: Case Study of Large-Span and Variable Cross-Section Subway Crossover Tunnel. Applied Sciences. 2026;16(18):9230. doi:10.3390/app16189230

BibTeX
@article{Li2026,
  author = {Li, Lei and Lei, Tao and Wang, Mingye and Liu, Weizheng and Lu, Weihua and Liu, Guiyong},
  title = {Mechanical Behavior and Stability Analysis of Underground Excavation Construction: Case Study of Large-Span and Variable Cross-Section Subway Crossover Tunnel},
  journal = {Applied Sciences},
  year = {2026},
  volume = {16},
  number = {18},
  pages = {9230},
  doi = {10.3390/app16189230}
}