Evaluating the Reliability of Cross-Building Load Forecasting Under Distribution Shift and Sensor Missingness
Applied Sciences · 11.08.2026 · 16 (16) · 7984
DOI: 10.3390/app16167984 ↗Kurz gefasst
Fachartikel in der Zeitschrift Applied Sciences, online erschienen am 11.08.2026. Verfasst von Yunkai Hao und 2 weiteren Autor:innen. Die Arbeit wurde bisher 5-mal zitiert (Crossref) und nennt 45 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: the Shanxi Provincial Research Foundation for Basic Research.
Abstract (Originalsprache)
Short-term building-electricity-load forecasting is important for energy management and smart-building operation. However, existing evaluations mainly focus on prediction accuracy and provide limited assessment of reliability under cross-building shifts and data quality variations. This study develops an empirical evaluation framework based on the HEEW dataset. A five-fold cross-building validation protocol was designed, including 55 main buildings and 27 additional buildings for extended sensitivity analysis. The prediction performance, sensor missingness robustness, prediction interval calibration, and model interpretation stability were evaluated. The results show that the LightGBM residual model outperforms the Lag-1 persistence baseline in cross-building forecasting. It reduces Normalized Mean Absolute Error (NMAE) by 11.3% in the unseen-building future-year scenario. Missingness experiments indicate that historical load features have a stronger influence on one-hour-ahead forecasting than weather features. A 50% missing rate in auxiliary load history increases NMAE by 96.71%, while weather feature missingness causes limited degradation. Conformal prediction maintains reasonable coverage for seen buildings but shows reduced coverage after transferring to unseen buildings. SHAP analysis further shows stable feature importance patterns across different scenarios. Overall, this study shows that the reliability of cross-building load forecasting should be evaluated from multiple angles, beyond point prediction accuracy alone.
Förderung
- the Shanxi Provincial Research Foundation for Basic Research
Zitieren
APA
Hao, Y., Yang, J., & Ji, Z. (2026). Evaluating the Reliability of Cross-Building Load Forecasting Under Distribution Shift and Sensor Missingness. Applied Sciences, 16(16), 7984. https://doi.org/10.3390/app16167984
Vancouver
Hao Y, Yang J, Ji Z. Evaluating the Reliability of Cross-Building Load Forecasting Under Distribution Shift and Sensor Missingness. Applied Sciences. 2026;16(16):7984. doi:10.3390/app16167984
BibTeX
@article{Hao2026,
author = {Hao, Yunkai and Yang, Jian and Ji, Zhigang},
title = {Evaluating the Reliability of Cross-Building Load Forecasting Under Distribution Shift and Sensor Missingness},
journal = {Applied Sciences},
year = {2026},
volume = {16},
number = {16},
pages = {7984},
doi = {10.3390/app16167984}
}
EUVIMED