EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Influence Mechanisms of Earth Pressure Balance Shield Tunneling Parameters on Chamber Pressure and Surface Settlement: A Theoretical and FDM-DEM Coupled Analysis

Weiguo He, Yang Luo, Yong Yu, Yaming Zhang, Tengfei Li, Wenjun Liu, Yijie Zhang

Applied Sciences · 26.07.2026 · 16 (15) · 7461

DOI: 10.3390/app16157461 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Applied Sciences, online erschienen am 26.07.2026. Verfasst von Weiguo He und 6 weiteren Autor:innen. Die Arbeit nennt 45 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Natural Science Foundation of China Youth Project, Shandong Provincial Natural Science Foundation Youth Fund Program, Science and Technology Research and Development Program of China Railway Group Limited.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

In earth pressure balance (EPB) shield tunneling, chamber pressure control is essential for maintaining excavation-face stability and limiting surface settlement. However, the influence mechanisms of key tunneling parameters on chamber pressure and ground response remain difficult to clarify when soil conditioning, cutterhead squeezing, muck discharge, and ground deformation are considered together. To address this issue, this study establishes a theoretical mechanical model for EPB shield tunneling and develops a calibrated three-dimensional FDM–DEM coupled numerical model based on the Jinan Metro Line 6 project. Triaxial and slump tests were used to calibrate the macro–micro parameters of unconditioned and foam-conditioned soil. The effects of tunneling speed, cutterhead speed, and screw conveyor speed on chamber pressure distribution and surface settlement were then analyzed. The results show that tunneling speed mainly affects the overall chamber pressure and face-support condition, screw conveyor speed controls muck discharge and pressure release, and cutterhead speed influences the spatial distribution of chamber pressure and settlement response. This study provides a theoretical and numerical basis for understanding chamber pressure evolution and coordinating tunneling parameters in EPB shield construction.

Förderung

  • National Natural Science Foundation of China Youth Project
  • Shandong Provincial Natural Science Foundation Youth Fund Program
  • Science and Technology Research and Development Program of China Railway Group Limited

Zitieren

APA

He, W., Luo, Y., Yu, Y., Zhang, Y., Li, T., Liu, W., & Zhang, Y. (2026). Influence Mechanisms of Earth Pressure Balance Shield Tunneling Parameters on Chamber Pressure and Surface Settlement: A Theoretical and FDM-DEM Coupled Analysis. Applied Sciences, 16(15), 7461. https://doi.org/10.3390/app16157461

Vancouver

He W, Luo Y, Yu Y, Zhang Y, Li T, Liu W, et al. Influence Mechanisms of Earth Pressure Balance Shield Tunneling Parameters on Chamber Pressure and Surface Settlement: A Theoretical and FDM-DEM Coupled Analysis. Applied Sciences. 2026;16(15):7461. doi:10.3390/app16157461

BibTeX
@article{He2026,
  author = {He, Weiguo and Luo, Yang and Yu, Yong and Zhang, Yaming and Li, Tengfei and Liu, Wenjun and Zhang, Yijie},
  title = {Influence Mechanisms of Earth Pressure Balance Shield Tunneling Parameters on Chamber Pressure and Surface Settlement: A Theoretical and FDM-DEM Coupled Analysis},
  journal = {Applied Sciences},
  year = {2026},
  volume = {16},
  number = {15},
  pages = {7461},
  doi = {10.3390/app16157461}
}
Kostenlos starten →