Research on the Process Parameters and Mechanism of Long-Slit Sealing Failure Plugging of Blowout Preventer Based on CFD-DEM

Zhi Zhang, Xuliang Zhang, Zhiwei Liu, Xitian Shi, Jun Chi, Jiajia Jing, Guorong Wang, Mirui Chen

Applied Sciences · 03.07.2026 · 16 (13) · 6646

DOI: 10.3390/app16136646 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Applied Sciences, online erschienen am 03.07.2026. Verfasst von Zhi Zhang und 7 weiteren Autor:innen. Die Arbeit nennt 23 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Tarim Oilfield.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

In the process of oil and gas drilling, the blowout preventer (BOP) serves as the last line of defense before wellhead loss of control, and its sealing reliability is of critical importance. However, under the erosion of high-pressure sand-containing fluids, the sealing components of the BOP are prone to failure, resulting in long-slit-type leakage ports, which seriously threaten well control safety. In response to the current lack of theoretical guidance for emergency plugging process parameters, this paper adopts the coupled computational fluid dynamics and discrete element method (CFD-DEM) to establish a numerical model for the plugging of long-slit-type gaps with particles under blowout conditions. The migration and bridging plugging behaviors of three typical shaped particles, namely spherical, cylindrical, and square, under different sizes, concentrations, and pump injection rates are systematically studied. The results indicate that particle transport within the wellbore can be divided into an initial transport stage dominated by jet diffusion and a plugging-structure formation stage dominated by bridging and particle accumulation. When the particle size exceeds the slit width, cylindrical particles exhibit comparatively better plugging performance under the conditions considered in this study. For a long-slit leakage channel with a width of 5 mm, the combination of cylindrical particles with an equivalent diameter of 6 mm, a particle volume concentration of 20%, and a pumping rate of 2.4 m3/min demonstrated relatively favorable overall plugging performance. The particle concentration mainly affects the bridging time, and the bridging time tends to stabilize when the concentration reaches 20%. The higher the pump injection rate, the earlier the particles reach the gap opening, but it has little impact on the final plugging effect. This study provides a scientific basis for the optimization of emergency plugging process parameters after BOP sealing failure, filling the gap in the research on the plugging mechanism of equipment leakage under blowout conditions.

Förderung

  • Tarim Oilfield

Zitieren

APA

Zhang, Z., Zhang, X., Liu, Z., Shi, X., Chi, J., Jing, J., Wang, G., & Chen, M. (2026). Research on the Process Parameters and Mechanism of Long-Slit Sealing Failure Plugging of Blowout Preventer Based on CFD-DEM. Applied Sciences, 16(13), 6646. https://doi.org/10.3390/app16136646

Vancouver

Zhang Z, Zhang X, Liu Z, Shi X, Chi J, Jing J, et al. Research on the Process Parameters and Mechanism of Long-Slit Sealing Failure Plugging of Blowout Preventer Based on CFD-DEM. Applied Sciences. 2026;16(13):6646. doi:10.3390/app16136646

BibTeX
@article{Zhang2026,
  author = {Zhang, Zhi and Zhang, Xuliang and Liu, Zhiwei and Shi, Xitian and Chi, Jun and Jing, Jiajia and Wang, Guorong and Chen, Mirui},
  title = {Research on the Process Parameters and Mechanism of Long-Slit Sealing Failure Plugging of Blowout Preventer Based on CFD-DEM},
  journal = {Applied Sciences},
  year = {2026},
  volume = {16},
  number = {13},
  pages = {6646},
  doi = {10.3390/app16136646}
}
Kostenlos starten →