EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Research on Construction Sequencing and Deformation Control for Foundation Pit Groups

Ziwei Yin, Ruizhe Jin, Shouye Guan, Zhiwei Chen, Guoliang Dai, Wenbo Zhu

Applied Sciences · 09.07.2025 · 15 (14) · 7719

DOI: 10.3390/app15147719 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Applied Sciences, online erschienen am 09.07.2025. Verfasst von Ziwei Yin und 5 weiteren Autor:innen. Die Arbeit wurde bisher 7-mal zitiert (Crossref) und nennt 38 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Natural Science Foundation of China, Research Fund for Advanced Ocean Institute of Southeast University.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

With the rapid urbanization and increasing development of underground spaces, foundation pit groups in complex geological environments encounter considerable challenges in deformation control. These challenges are especially prominent in cases of adjacent constructions, complex geology, and environmentally sensitive areas. Nevertheless, existing research is lacking in systematic analysis of construction sequencing and the interaction mechanisms between foundation pit groups. This results in gaps in comprehending stress redistribution and optimal excavation strategies for such configurations. To address these gaps, this study integrates physical model tests and PLAXIS 3D numerical simulations to explore the Nanjing Jiangbei New District Phase II pit groups. It concentrates on deformations in segmented and adjacent configurations under varying excavation sequences and spacing conditions. Key findings reveal that simultaneous excavation in segmented pit groups optimizes deformation control through symmetrical stress relief via bilateral unloading, reducing shared diaphragm wall displacement by 18–25% compared to sequential methods. Sequential excavations induce complex soil stress redistribution from asymmetric unloading, with deep-to-shallow sequencing minimizing exterior wall deformation (≤0.12%He). For adjacent foundation pit groups, simultaneous excavation achieves minimum displacement interference, while phased construction requires prioritizing large-section excavation first to mitigate cumulative deformations through optimized stress transfer. When the spacing-to-depth ratio (B/He) is below 1, horizontal displacements of retaining structures increase by 43% due to spacing effects. This study quantifies the effects of excavation sequences and spacing configurations on pit group deformation, establishing a theoretical framework for optimizing construction strategies and enhancing retaining structure stability. The findings are highly significant for underground engineering design and construction in complex urban geological settings, especially in high-density areas with spatial and geotechnical constraints.

Förderung

  • National Natural Science Foundation of China
  • Research Fund for Advanced Ocean Institute of Southeast University

Zitieren

APA

Yin, Z., Jin, R., Guan, S., Chen, Z., Dai, G., & Zhu, W. (2025). Research on Construction Sequencing and Deformation Control for Foundation Pit Groups. Applied Sciences, 15(14), 7719. https://doi.org/10.3390/app15147719

Vancouver

Yin Z, Jin R, Guan S, Chen Z, Dai G, Zhu W. Research on Construction Sequencing and Deformation Control for Foundation Pit Groups. Applied Sciences. 2025;15(14):7719. doi:10.3390/app15147719

BibTeX
@article{Yin2025,
  author = {Yin, Ziwei and Jin, Ruizhe and Guan, Shouye and Chen, Zhiwei and Dai, Guoliang and Zhu, Wenbo},
  title = {Research on Construction Sequencing and Deformation Control for Foundation Pit Groups},
  journal = {Applied Sciences},
  year = {2025},
  volume = {15},
  number = {14},
  pages = {7719},
  doi = {10.3390/app15147719}
}
Kostenlos starten →