A Two-Phase Iterative Mathematical Programming-Based Heuristic for a Flexible Job Shop Scheduling Problem with Transportation
Applied Sciences · 21.04.2023 · 13 (8) · 5215
DOI: 10.3390/app13085215 ↗Kurz gefasst
Fachartikel in der Zeitschrift Applied Sciences, online erschienen am 21.04.2023. Verfasst von Che Han Lim und 1 weiteren Autor:innen. Die Arbeit wurde bisher 17-mal zitiert (Crossref) und nennt 33 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Ministry of Education, Singapore.
Abstract (Originalsprache)
In a flexible job shop problem with transportation (FJSPT), a typical flexible manufacturing system comprises transporters that pick up and deliver jobs for processing at flexible job shops. This problem has grown in importance through the wide use of automated transporters in Industry 4.0. In this article, a two-phase iterative mathematical programming-based heuristic is proposed to minimize makespan using a machine-operation assignment centric decomposition scheme. The first phase approximates the FJSPT through an augmented flexible job shop scheduling problem (FJSP + T) that reduces the solution space while serving as a heuristic in locating good machine-operation assignments. In the second phase, a job shop scheduling problem with transportation (JSPT) network is constructed from these assignments and solved for the makespan. Compared to prior JSPT implementations, the proposed JSPT model considers job pre-emption, which is instrumental in enabling this FJSPT implementation to outperform certain established benchmarks, confirming the importance of considering job pre-emption. Results indicate that the proposed approach is effective, robust, and competitive.
Förderung
- Ministry of Education, Singapore
Zitieren
APA
Lim, C. H., & Moon, S. K. (2023). A Two-Phase Iterative Mathematical Programming-Based Heuristic for a Flexible Job Shop Scheduling Problem with Transportation. Applied Sciences, 13(8), 5215. https://doi.org/10.3390/app13085215
Vancouver
Lim CH, Moon SK. A Two-Phase Iterative Mathematical Programming-Based Heuristic for a Flexible Job Shop Scheduling Problem with Transportation. Applied Sciences. 2023;13(8):5215. doi:10.3390/app13085215
BibTeX
@article{Lim2023,
author = {Lim, Che Han and Moon, Seung Ki},
title = {A Two-Phase Iterative Mathematical Programming-Based Heuristic for a Flexible Job Shop Scheduling Problem with Transportation},
journal = {Applied Sciences},
year = {2023},
volume = {13},
number = {8},
pages = {5215},
doi = {10.3390/app13085215}
}
EUVIMED