EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

The role of cost-benefit analysis in environmental impact assessment with emphasis on Malaysia

Mohammad Hirzan Md Zahar, Pozi Milow

Frontiers in Environmental Science · 02.06.2026 · 14

DOI: 10.3389/fenvs.2026.1752837 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Frontiers in Environmental Science, online erschienen am 02.06.2026. Verfasst von Mohammad Hirzan Md Zahar und 1 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref) und nennt 69 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Cost–Benefit Analysis (CBA) has long been recognized as a useful decision-support tool in environmental management, including its potential application within Environmental Impact Assessment (EIA). In Malaysia, EIA guidelines since 1987 have referred to CBA as a possible approach to balance environmental, social and economic considerations. However, its actual use in EIA practice remains limited and inconsistent, raising questions about its perceived relevance, methodological application and influence on decision-making. This study examines the treatment of CBA in Malaysian EIA reports through a qualitative content analysis of 30 available published EIA reports from various sectors. The analysis focuses on three key indicators, which are the detail level of CBA, the presence and clarity of stated methodologies and the monetization of impacts. The results reveal that a significant number of reports make only qualitative references to project benefits without quantified economic evaluation, while others mention CBA-related concepts in general terms but lack methodological rigor. Only a few reports attempt to monetize costs and benefits and even then, the approaches are often incomplete or not clearly justified. The findings highlight a gap between the theoretical value of CBA in supporting transparent, evidence-based EIA decisions and its practical application in Malaysia. This gap may be linked to cost to conduct the economic valuation study, limited technical capacity, low impact on project approval decisions and the absence of detailed guidelines for conducting CBA within the EIA framework. Recommendations include strengthening policy guidance, building practitioner capacity and integrating economic valuation more systematically into EIA processes to improve the transparency, accountability and overall quality of environmental decision-making.

Zitieren

APA

Zahar, M. H. M., & Milow, P. (2026). The role of cost-benefit analysis in environmental impact assessment with emphasis on Malaysia. Frontiers in Environmental Science, 14. https://doi.org/10.3389/fenvs.2026.1752837

Vancouver

Zahar MHM, Milow P. The role of cost-benefit analysis in environmental impact assessment with emphasis on Malaysia. Frontiers in Environmental Science. 2026;14. doi:10.3389/fenvs.2026.1752837

BibTeX
@article{Zahar2026,
  author = {Zahar, Mohammad Hirzan Md and Milow, Pozi},
  title = {The role of cost-benefit analysis in environmental impact assessment with emphasis on Malaysia},
  journal = {Frontiers in Environmental Science},
  year = {2026},
  volume = {14},
  doi = {10.3389/fenvs.2026.1752837}
}
Kostenlos starten →