Pengukuran Tahanan Isolasi Terminal Incoming Gardu Kubikel 20KV di PT Haleyora Power Region 3 Jawa Timur Area Mojokerto

Yulianto Sukoco, Nailul Izzati, Humaidillah Kurniadi Wardana

Elconika: Jurnal Teknik Elektro · 2023

DOI: 10.33752/elconika.v1i2.4162 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Elconika: Jurnal Teknik Elektro, 2023. Verfasst von Yulianto Sukoco und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

PT Haleyora Power is a subsidiary of PT PLN which is engaged in the operation and maintenance of electricity transmission and distribution networks. One of them is routine maintenance of the 20kv cubicle substation with the aim of maintaining the reliability of distribution in the electricity system. For Region 3 East Java, the Mojokerto area itself has 3 working areas, namely, Mojokerto, Jombang, and the Nganjuk area. In the process the cubicle is divided into 3 points, namely, incoming as input from the 20kv transformer output owned by PLN, metering is the part that functions to monitor (current, voltage, and electricity demand), the last is outgoing which is the 20kv output which will enter the transformer input customer/industry property. In this study, what was measured was insulation resistance using an insulation tester / megger and focused on the incoming terminal, the terminal points measured were between terminals r-s, r-t, s-t, r-n, s-n, and t-n. The minimum standard for measuring insulation resistance in a 20kv cubicle is 20MOhm. With an insulation resistance of more than 20MOhm, the insulation resistance obtained is good enough.

Zitieren

APA

Sukoco, Y., Izzati, N., & Wardana, H. K. (2023). Pengukuran Tahanan Isolasi Terminal Incoming Gardu Kubikel 20KV di PT Haleyora Power Region 3 Jawa Timur Area Mojokerto. Elconika: Jurnal Teknik Elektro. https://doi.org/10.33752/elconika.v1i2.4162

Vancouver

Sukoco Y, Izzati N, Wardana HK. Pengukuran Tahanan Isolasi Terminal Incoming Gardu Kubikel 20KV di PT Haleyora Power Region 3 Jawa Timur Area Mojokerto. Elconika: Jurnal Teknik Elektro. 2023. doi:10.33752/elconika.v1i2.4162

BibTeX
@article{Sukoco2023,
  author = {Sukoco, Yulianto and Izzati, Nailul and Wardana, Humaidillah Kurniadi},
  title = {Pengukuran Tahanan Isolasi Terminal Incoming Gardu Kubikel 20KV di PT Haleyora Power Region 3 Jawa Timur Area Mojokerto},
  journal = {Elconika: Jurnal Teknik Elektro},
  year = {2023},
  doi = {10.33752/elconika.v1i2.4162}
}
Kostenlos starten →