EUVIMEDEUVIMED entdecken
Crossref

Comparative Accuracy of 5D BIM-Based Quantity Estimation Against Conventional and SNI-Based Calculations in Hospital Construction

Deni Setiawan, Robby Tallar, Daud Wiyono, Dwiki Krisnandi

Bentang : Jurnal Teoritis dan Terapan Bidang Rekayasa Sipil · 15.07.2026 · 14 (2) · 207-220

DOI: 10.33558/bentang.v14i2.12283 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Bentang : Jurnal Teoritis dan Terapan Bidang Rekayasa Sipil, online erschienen am 15.07.2026. Verfasst von Deni Setiawan und 3 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Accurate material quantity estimation plays an important role in construction projects because discrepancies in conventional estimation methods often result in cost overruns, work inefficiencies, and inaccuracies in project planning. Conventional estimation processes are generally still carried out through manual calculations, which are prone to errors and differences in interpretation. Therefore, a more reliable and integrated method, such as 5D Building Information Modelling (BIM), is required. This study aims to analyze the accuracy level of 5D BIM-based quantity estimation compared to conventional calculation methods performed by consultants in real construction projects. The study was conducted on the Emergency Building construction project of “X” General Hospital by comparing reinforcement quantities and ready-mix concrete volumes obtained from BIM modelling, consultant calculations, and manual verification based on SNI 2847:2019. The modelling process was carried out using Cubicost TRB for reinforcement analysis and Cubicost TAS for concrete volume estimation. The results indicate that the average difference in reinforcement quantity estimation between BIM modelling and consultant calculations is approximately 18%, while the difference in concrete volume estimation reaches 17% for column elements and 3.25% for beam elements. Manual validation based on SNI 2847:2019 shows that BIM-based estimation has smaller deviations compared to conventional methods. These findings demonstrate that the implementation of 5D BIM can improve the accuracy, transparency, and reliability of material quantity estimation in construction projects.

Zitieren

APA

Setiawan, D., Tallar, R., Wiyono, D., & Krisnandi, D. (2026). Comparative Accuracy of 5D BIM-Based Quantity Estimation Against Conventional and SNI-Based Calculations in Hospital Construction. Bentang : Jurnal Teoritis dan Terapan Bidang Rekayasa Sipil, 14(2), 207-220. https://doi.org/10.33558/bentang.v14i2.12283

Vancouver

Setiawan D, Tallar R, Wiyono D, Krisnandi D. Comparative Accuracy of 5D BIM-Based Quantity Estimation Against Conventional and SNI-Based Calculations in Hospital Construction. Bentang : Jurnal Teoritis dan Terapan Bidang Rekayasa Sipil. 2026;14(2):207-220. doi:10.33558/bentang.v14i2.12283

BibTeX
@article{Setiawan2026,
  author = {Setiawan, Deni and Tallar, Robby and Wiyono, Daud and Krisnandi, Dwiki},
  title = {Comparative Accuracy of 5D BIM-Based Quantity Estimation Against Conventional and SNI-Based Calculations in Hospital Construction},
  journal = {Bentang : Jurnal Teoritis dan Terapan Bidang Rekayasa Sipil},
  year = {2026},
  volume = {14},
  number = {2},
  pages = {207--220},
  doi = {10.33558/bentang.v14i2.12283}
}
Kostenlos starten →