Improvement of Overall Equipment Effectiveness (OEE) of Dump Truck Scania P360/P410 in Customer PT. XYZ
Proceedings of The Conference on Management and Engineering in Industry · 17.01.2026 · 6 (2) · 59-64
DOI: 10.33555/cmei.v6i2.167 ↗Kurz gefasst
Fachartikel in der Zeitschrift Proceedings of The Conference on Management and Engineering in Industry, online erschienen am 17.01.2026. Verfasst von Kieki Wintarto und 2 weiteren Autor:innen.
Abstract (Originalsprache)
XYZ, a mining company in South Sumatra, has a physical availability problem in 2022 below the 80% target, especially in the COAL Dump Truck (65%) and OB Dump Truck (58%) units. So that it has an impact on the decrease in production by coal production of 99.71% and OB by 96.09% (3,613,902 BCM) from the 2022 target. Research conducted from January to June 2023 shows that coal dump trucks (32.28%) and OEE OB dump trucks (43.86%) did not reach the target below the target of 64.00%. This shows that a decrease in physical availability will reduce OEE. The RCA method is used to identify several problems: unit breakdown, unprepared spare parts, incompetent instructors, and production not achieved. The improvements carried out in this research are maintenance training, operational training, the customer maintenance improvement program (CMIP), and the customer operation improvement program (COIP). The results of the improvement show that there is an increase in CMIP results of 13.24% and COIP results of 11.27%. Improvements carried out in July–November 2023 show that PA COAL Dump Truck increased to 97.31% (OEE 103.42%) and PA Dump Truck OB increased to 87.30% (OEE 91.99%). The improvements made prove that PA improvements can improve OEE, which indicates the success of the improvement program carried out.
Zitieren
APA
Wintarto, K., Nasution, H., & Baskoro, G. (2026). Improvement of Overall Equipment Effectiveness (OEE) of Dump Truck Scania P360/P410 in Customer PT. XYZ. Proceedings of The Conference on Management and Engineering in Industry, 6(2), 59-64. https://doi.org/10.33555/cmei.v6i2.167
Vancouver
Wintarto K, Nasution H, Baskoro G. Improvement of Overall Equipment Effectiveness (OEE) of Dump Truck Scania P360/P410 in Customer PT. XYZ. Proceedings of The Conference on Management and Engineering in Industry. 2026;6(2):59-64. doi:10.33555/cmei.v6i2.167
BibTeX
@article{Wintarto2026,
author = {Wintarto, Kieki and Nasution, Henry and Baskoro, Gembong},
title = {Improvement of Overall Equipment Effectiveness (OEE) of Dump Truck Scania P360/P410 in Customer PT. XYZ},
journal = {Proceedings of The Conference on Management and Engineering in Industry},
year = {2026},
volume = {6},
number = {2},
pages = {59--64},
doi = {10.33555/cmei.v6i2.167}
}
EUVIMED