EUVIMEDEUVIMED entdecken
Crossref

ANALISIS RISIKO KECELAKAAN KERJA PEMASANGAN PRECAST FASADE PADA PROYEK ASPEN RESIDENCE (Studi Kasus Mahasiswa Fakultas Ekonomi dan Bisnis Universitas Kristen Indonesia)

Reygita Bintang Mutiara, Poerwaningsih S. Legowo, Edison Siregar

Fundamental Management Journal · 04.04.2026 · 11 (1) · 108-128

DOI: 10.33541/fjm.v11i1.8025 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Fundamental Management Journal, online erschienen am 04.04.2026. Verfasst von Reygita Bintang Mutiara und 2 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The Aspen Residence Tower D project is considered to have significant occupational risk due to the high complexity of the building, which consists of 23 floors and 2 basements (25 floors total), while Towers A, B, and C are already occupied. Construction activity near active residents increases the risk of work-related accidents. This research uses the OHSAS 18001:2007 standard for risk analysis, combining preliminary surveys and questionnaires to identify, assess, and prioritize risks. The Bowtie method is used to analyze major risks with moderate to extreme levels. The study found three risks in the "moderate" category (dust pollution, burns, UV exposure), seven in the "high" category (pinched hand, chain block injuries, pinched feet, scratches, electric shocks, eye injuries, gas exposure), and two in the "extreme" category (falling precast, worker falling from height). These extreme risks were analyzed in detail to determine causes, impacts, and controls. Keywords: Risk analysis, Occupational accident, Likelihood, Severity, Risk matrix, Bowtie method

Zitieren

APA

Mutiara, R. B., Legowo, P. S., & Siregar, E. (2026). ANALISIS RISIKO KECELAKAAN KERJA PEMASANGAN PRECAST FASADE PADA PROYEK ASPEN RESIDENCE (Studi Kasus Mahasiswa Fakultas Ekonomi dan Bisnis Universitas Kristen Indonesia). Fundamental Management Journal, 11(1), 108-128. https://doi.org/10.33541/fjm.v11i1.8025

Vancouver

Mutiara RB, Legowo PS, Siregar E. ANALISIS RISIKO KECELAKAAN KERJA PEMASANGAN PRECAST FASADE PADA PROYEK ASPEN RESIDENCE (Studi Kasus Mahasiswa Fakultas Ekonomi dan Bisnis Universitas Kristen Indonesia). Fundamental Management Journal. 2026;11(1):108-128. doi:10.33541/fjm.v11i1.8025

BibTeX
@article{Mutiara2026,
  author = {Mutiara, Reygita Bintang and Legowo, Poerwaningsih S. and Siregar, Edison},
  title = {ANALISIS RISIKO KECELAKAAN KERJA PEMASANGAN PRECAST FASADE PADA PROYEK ASPEN RESIDENCE (Studi Kasus Mahasiswa Fakultas Ekonomi dan Bisnis Universitas Kristen Indonesia)},
  journal = {Fundamental Management Journal},
  year = {2026},
  volume = {11},
  number = {1},
  pages = {108--128},
  doi = {10.33541/fjm.v11i1.8025}
}
Kostenlos starten →