EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC-SA 4.0

Implementation of Lean Manufacturing To Reduce Waste in Calliper Bracket Production

Husein Maulana Dwi Wijatmiko, Mohamad Toha, Alfi Syahrin Syah Putri

JIE Scientific Journal on Research and Application of Industrial System · 22.04.2025 · 10 (1) · 29-46

DOI: 10.33021/jie.v10i1.6735 ↗

Kurz gefasst

Fachartikel in der Zeitschrift JIE Scientific Journal on Research and Application of Industrial System, online erschienen am 22.04.2025. Verfasst von Husein Maulana Dwi Wijatmiko und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Initial observations at PT. PPE showed that the production of calliper brackets failed to meet monthly targets for four consecutive months. Investigations carried out by the team showed that the inability to meet production targets was caused by waiting and transportation activity, which can cause longer production lead times. Some wastes were found,such aswaiting for a forklift, andtransportation of material movingsbetween workstations. To overcome this problem, PT. PPE uses 5S, one of the lean manufacturing tools. The research began with direct observation to determine the actual production floor situation. The next stage is the problem identification process using Value Stream Mapping (VSM), Process Activity Mapping(PAM), spaghetti diagram, and fishbone diagram. Some 5S-based corrective actions implemented include sorting unused goods, arranging materials, maintaining cleanliness, updating work instructions, and creating a 5S check sheet. The result of implementing 5S in calliper bracket production was that lead time decreased from 8.05 days to 5.53 days or 31.30%. Sales losses can be reduced from IDR 1,936,100,000 to IDR 111,150,000 or decrease by 94.26%.

Zitieren

APA

Wijatmiko, H. M. D., Toha, M., & Putri, A. S. S. (2025). Implementation of Lean Manufacturing To Reduce Waste in Calliper Bracket Production. JIE Scientific Journal on Research and Application of Industrial System, 10(1), 29-46. https://doi.org/10.33021/jie.v10i1.6735

Vancouver

Wijatmiko HMD, Toha M, Putri ASS. Implementation of Lean Manufacturing To Reduce Waste in Calliper Bracket Production. JIE Scientific Journal on Research and Application of Industrial System. 2025;10(1):29-46. doi:10.33021/jie.v10i1.6735

BibTeX
@article{Wijatmiko2025,
  author = {Wijatmiko, Husein Maulana Dwi and Toha, Mohamad and Putri, Alfi Syahrin Syah},
  title = {Implementation of Lean Manufacturing To Reduce Waste in Calliper Bracket Production},
  journal = {JIE Scientific Journal on Research and Application of Industrial System},
  year = {2025},
  volume = {10},
  number = {1},
  pages = {29--46},
  doi = {10.33021/jie.v10i1.6735}
}
Kostenlos starten →