Dynamic load testing of a post tensioned reinforced concrete arch bridge for experimental reasons using a leopard 2A7HU main battle tank
Concrete Structures · 2026 · 27 · 13-20
DOI: 10.32970/cs.2026.1.3 ↗Kurz gefasst
Fachartikel in der Zeitschrift Concrete Structures, 2026. Verfasst von Bence Hajós und 1 weiteren Autor:innen.
Abstract (Originalsprache)
When planning military operations, mobility is fundamentally influenced by the load capacity of bridges. Exact baseline data and parameters are needed to assess the load capacity of existing road bridges. Test loading can measure the actual behaviour of the bridge structure, which gives a more accurate response than numerical calculations based on hypothetical assumptions. This paper presents a test loading carried out in Hungary with military vehicles, a heavy logistics vehicle wheeled and a Leopard 2A7HU main battle tank, and its main results. The study contributes to reliable calculation of the dynamic effects of tracked vehicles.
Zitieren
APA
Hajós, B., & Kővári, Á. (2026). Dynamic load testing of a post tensioned reinforced concrete arch bridge for experimental reasons using a leopard 2A7HU main battle tank. Concrete Structures, 27, 13-20. https://doi.org/10.32970/cs.2026.1.3
Vancouver
Hajós B, Kővári Á. Dynamic load testing of a post tensioned reinforced concrete arch bridge for experimental reasons using a leopard 2A7HU main battle tank. Concrete Structures. 2026;27:13-20. doi:10.32970/cs.2026.1.3
BibTeX
@article{Hajs2026,
author = {Hajós, Bence and Kővári, Ákos},
title = {Dynamic load testing of a post tensioned reinforced concrete arch bridge for experimental reasons using a leopard 2A7HU main battle tank},
journal = {Concrete Structures},
year = {2026},
volume = {27},
pages = {13--20},
doi = {10.32970/cs.2026.1.3}
}
EUVIMED