Implementation and Evaluation of the Fuzzy Tsukamoto Method for Predicting Project Delay Risk
bit-Tech · 10.08.2026 · 9 (1) · 484-494
DOI: 10.32877/bt.v9i1.3923 ↗Kurz gefasst
Fachartikel in der Zeitschrift bit-Tech, online erschienen am 10.08.2026. Verfasst von Indriani Ayu Puspitasari und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).
Abstract (Originalsprache)
Manual project monitoring in medium-scale genset installation contractors creates critical blind spots in schedule deviation detection, especially when project information is dispersed across invoices, informal chat communications, and paper-based records. Without a centralized monitoring mechanism, management cannot intervene before schedule deviations escalate into contractual delays. This study developed a web-based Project Management Information System (PMIS) for a case study company incorporating an automated delay risk detection module driven by the Fuzzy Tsukamoto algorithm. The system was built using the Waterfall development method with PHP/Laravel and MySQL. Two contractual indicators extractable from standard project documents serve as algorithmic inputs: the billing realization percentage and the elapsed time percentage relative to total contract duration. Expert knowledge was elicited through structured interviews with a practitioner having over 20 years of industry experience, and formalized into nine IF–THEN rules with monotonic membership functions across three linguistic categories for each variable. Functional correctness was verified through Black Box Testing covering all 11 defined requirements. Accuracy validation against blind expert assessments across 25 real project records yielded 88% agreement (22 of 25 cases correctly classified). System usability, measured via the System Usability Scale (SUS), produced an average score of 87.5, categorized as Excellent. The Fuzzy Tsukamoto module embedded within an integrated web-based PMIS constitutes a practical, data-light early-warning instrument for delay risk detection, effective in genset installation contractor environments where structured historical project data are limited. The module evaluates delay risk based solely on billing realization and elapsed contract time.
Zitieren
APA
Puspitasari, I. A., Mumpuni, R., & Nurlaili, A. L. (2026). Implementation and Evaluation of the Fuzzy Tsukamoto Method for Predicting Project Delay Risk. bit-Tech, 9(1), 484-494. https://doi.org/10.32877/bt.v9i1.3923
Vancouver
Puspitasari IA, Mumpuni R, Nurlaili AL. Implementation and Evaluation of the Fuzzy Tsukamoto Method for Predicting Project Delay Risk. bit-Tech. 2026;9(1):484-494. doi:10.32877/bt.v9i1.3923
BibTeX
@article{Puspitasari2026,
author = {Puspitasari, Indriani Ayu and Mumpuni, Retno and Nurlaili, Afina Lina},
title = {Implementation and Evaluation of the Fuzzy Tsukamoto Method for Predicting Project Delay Risk},
journal = {bit-Tech},
year = {2026},
volume = {9},
number = {1},
pages = {484--494},
doi = {10.32877/bt.v9i1.3923}
}
EUVIMED