ANALISIS PENYEBAB KETERLAMBATAN PADA PROYEK REHABILITASI DAN RENOVASI SEKOLAH DI INDONESIA
Construction and Material Journal · 21.11.2026 · 8 (2) · 141-151
DOI: 10.32722/cmj.v8i2.8523 ↗Kurz gefasst
Fachartikel in der Zeitschrift Construction and Material Journal, online erschienen am 21.11.2026. Verfasst von Ayu Meiliasari und 1 weiteren Autor:innen.
Abstract (Originalsprache)
The Ministry of Public Works of Indonesia has been responsible for implementing rehabilitation and renovation works for primary nd secondary school facilities since 2019. Despite six years of implementation, the programme has consistently experienced project delays, with the percentage of delayed packages reaching 13.2%, 12.2%, and 21.05% in 2022, 2023, and 2024, respectively. This study aims to identify the significant factors contributing to these delays. A quantitative survey approach was employed, with data collected from 51 respondents comprising project owners, contractors, and supervision consultants. The Relative Importance Index (RII) method was applied to rank the identified delay factors. The results indicate that 26 out of 40 valid indicators were classified as highly influential (RII ≥ 0.8). The three most significant delay factors were delays in material delivery (RII = 0.945), insufficient or unavailable construction materials (RII = 0.933), and contractor financial difficulties (RII = 0.929). Most of the top-ranked factors were associated with the Construction Execution and Contract Closure phase. In addition, factors related to inappropriate contractor selection during procurement and inadequate project planning were also identified as significant contributors to project delays. The findings indicate that project delays are primarily driven by material-related issues, particularly delays in material delivery and insufficient material availability, followed by contractor-related constraints such as financial difficulties, inadequate workforce availability, low labour productivity, and ineffective project management. In addition, weaknesses in project planning, including inadequate planning and poor-quality design and planning documents, also contribute significantly to project delays. These findings suggest that delay mitigation efforts should focus on strengthening material supply chain management, improving contractor capacity and financial capability, enhancing workforce management, and improving the quality of project planning and design documentation. This study contributes to the understanding of delay factors in government-funded school rehabilitation and renovation projects in Indonesia and provides practical recommendations for project stakeholders to improve schedule performance and project delivery outcomes.
Zitieren
APA
Meiliasari, A., & Rarasati, A. D. (2026). ANALISIS PENYEBAB KETERLAMBATAN PADA PROYEK REHABILITASI DAN RENOVASI SEKOLAH DI INDONESIA. Construction and Material Journal, 8(2), 141-151. https://doi.org/10.32722/cmj.v8i2.8523
Vancouver
Meiliasari A, Rarasati AD. ANALISIS PENYEBAB KETERLAMBATAN PADA PROYEK REHABILITASI DAN RENOVASI SEKOLAH DI INDONESIA. Construction and Material Journal. 2026;8(2):141-151. doi:10.32722/cmj.v8i2.8523
BibTeX
@article{Meiliasari2026,
author = {Meiliasari, Ayu and Rarasati, Ayomi Dita},
title = {ANALISIS PENYEBAB KETERLAMBATAN PADA PROYEK REHABILITASI DAN RENOVASI SEKOLAH DI INDONESIA},
journal = {Construction and Material Journal},
year = {2026},
volume = {8},
number = {2},
pages = {141--151},
doi = {10.32722/cmj.v8i2.8523}
}
EUVIMED