EUVIMEDEUVIMED entdecken
Crossref

IMPLEMENTASI BIM UNTUK PENANGGULANGAN BAHAYA DAN RISIKO PADA PEKERJAAN STRUKTUR ATAP BAJA PROYEK GEDUNG WAREHOUSE

Muhammad Iqbal Zultha, Ayu Herzanita

Construction and Material Journal · 21.11.2026 · 8 (2) · 185-196

DOI: 10.32722/cmj.v8i2.5983 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Construction and Material Journal, online erschienen am 21.11.2026. Verfasst von Muhammad Iqbal Zultha und 1 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

In the construction industry, OHS (Occupational Health and Safety) is essential to ensure safe working conditions for workers and reduce the risk of occupational accidents. Many construction workers still have limited awareness and understanding of workplace hazards. The development of Building Information Modeling (BIM) technology can assist in reducing the risk of occupational accidents and work-related illness, as well as ensuring that buildings or infrastructure are built in accordance with high OHS standards. This research aims to develop BIM modeling for steel roof structural work integrated with hazard and risk identification. The research is a quantitative study with a descriptive approach. This research was conducted at the Depok Warehouse Construction Project on steel roofing work. The data used in this study consisted of primary and secondary data. This research is carried out to identify the hazards & risks of roofing work according to the IBPRP (Hazard Identification, Risk Assessment, Risk Control and Opportunities) table format of the PUPR Ministerial Regulation No 10 of 2021. The highest risk was identified in steel erection activities using a tower crane. The result of the risk analysis was subsequently integrated into BIM model. This BIM can be used to help address hazards and risks in steel roof structural work by providing better visualization and more comprehensive information about workplace conditions. In the future, it is expected that more researchers can utilize BIM software in conducting hazard identification research or other research that utilizes and improves the use of BIM.

Zitieren

APA

Zultha, M. I., & Herzanita, A. (2026). IMPLEMENTASI BIM UNTUK PENANGGULANGAN BAHAYA DAN RISIKO PADA PEKERJAAN STRUKTUR ATAP BAJA PROYEK GEDUNG WAREHOUSE. Construction and Material Journal, 8(2), 185-196. https://doi.org/10.32722/cmj.v8i2.5983

Vancouver

Zultha MI, Herzanita A. IMPLEMENTASI BIM UNTUK PENANGGULANGAN BAHAYA DAN RISIKO PADA PEKERJAAN STRUKTUR ATAP BAJA PROYEK GEDUNG WAREHOUSE. Construction and Material Journal. 2026;8(2):185-196. doi:10.32722/cmj.v8i2.5983

BibTeX
@article{Zultha2026,
  author = {Zultha, Muhammad Iqbal and Herzanita, Ayu},
  title = {IMPLEMENTASI BIM UNTUK PENANGGULANGAN BAHAYA DAN RISIKO PADA PEKERJAAN STRUKTUR ATAP BAJA PROYEK GEDUNG WAREHOUSE},
  journal = {Construction and Material Journal},
  year = {2026},
  volume = {8},
  number = {2},
  pages = {185--196},
  doi = {10.32722/cmj.v8i2.5983}
}
Kostenlos starten →