LAST PLANNER SYSTEM (LPS) IMPLEMENTATION ON JAKARTA-CIKAMPEK II ELEVATED TOLL ROAD PROJECT

Ni'mah Tozahro, Afrizal Nursin

Applied Research on Civil Engineering and Environment (ARCEE) · 2020

DOI: 10.32722/arcee.v2i01.2859 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Applied Research on Civil Engineering and Environment (ARCEE), 2020. Verfasst von Ni'mah Tozahro und 1 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

In construction industry, its implementation of the construction has its own constraints. A good management or project management system is needed to minimize the risk of these constraints. The latest project management concept that has proven more effective and efficient is Last Planner System method. This study aims to investigate how the implementation of Last Planner System works on Jakarta-Cikampek II Elevated Toll Road Project. With the evaluation of weekly job evaluations using PPC (Percent Plan Completed) and Pareto Variance Constraint analysis, the constraint issues of this project will be identified. Then they are followed up to find the right solution in handling the constraints. The research method is done by conducting literature study, problem formulation, followed by implementing LPS method, which is through work flow control such as phase and pull plan, lookahead plan, constrain analysis, daily huddles, PPC (Percent Plan Completed) calculation, Pareto Chart analysis with data variation of issues that have been obtained. The results show that the average PPC weekly project is 83.04% and the most influential reason that must be concerned its priority is submittals.

Zitieren

APA

Tozahro, N., & Nursin, A. (2020). LAST PLANNER SYSTEM (LPS) IMPLEMENTATION ON JAKARTA-CIKAMPEK II ELEVATED TOLL ROAD PROJECT. Applied Research on Civil Engineering and Environment (ARCEE). https://doi.org/10.32722/arcee.v2i01.2859

Vancouver

Tozahro N, Nursin A. LAST PLANNER SYSTEM (LPS) IMPLEMENTATION ON JAKARTA-CIKAMPEK II ELEVATED TOLL ROAD PROJECT. Applied Research on Civil Engineering and Environment (ARCEE). 2020. doi:10.32722/arcee.v2i01.2859

BibTeX
@article{Tozahro2020,
  author = {Tozahro, Ni'mah and Nursin, Afrizal},
  title = {LAST PLANNER SYSTEM (LPS) IMPLEMENTATION ON JAKARTA-CIKAMPEK II ELEVATED TOLL ROAD PROJECT},
  journal = {Applied Research on Civil Engineering and Environment (ARCEE)},
  year = {2020},
  doi = {10.32722/arcee.v2i01.2859}
}
Kostenlos starten →