EUVIMEDEUVIMED entdecken
Open Access · CC BY-SA 4.0

Scheduling of Application for Siteplan Authorization Permit (Case of Licensing Process at Investment and Integrated Licensing Services Office in Sleman Regency)

Fitri Nugraheni, Vendie Abma, Sigit Yasien

Applied Research on Civil Engineering and Environment (ARCEE) · 2020

DOI: 10.32722/arcee.v1i02.2680 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Applied Research on Civil Engineering and Environment (ARCEE), 2020. Verfasst von Fitri Nugraheni und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The permit process must comply with laws and regulations. The permit functions as controlling and supervising tool from the government of activities in certain cases based on the guidelines that must be implemented. The permit also functions as a disciplinarian and regulator in accordance with the law in the administration of government. In the process, several constrains or obstacles often occur in terms of the period of the process as well as technical and non-technical constrains. In this research, an analysis of the scheduling of the site plan permit approval process is based on field data related to the site plan permit approval process with the PERT method. The data used are primary data in the form of interviews and filling in the form of questions and secondary data in the form of a site plan approval process flow. The data that has been collected is then processed and analyzed in several stages. First, calculate the expected time period (te) using interview data and the results of filling in the expected time period (te), so that the expected time period for each activity will be found in accordance with the site plan approval process flow. Second, determine the dependency relationship between activities. In this stage, the relationship between each activity is determined. Third, create a network by changing the existing site authorization process flow into a form of network planning. The results of the schedule using the PERT method are a period of 38 days with alternatives that can be done to reach the time (Tx) of 18 working days in accordance with the Regent Regulations. In addition, the probability of the overall activity being completed is 0.8531 or 85.31%.

Zitieren

APA

Nugraheni, F., Abma, V., & Yasien, S. (2020). Scheduling of Application for Siteplan Authorization Permit (Case of Licensing Process at Investment and Integrated Licensing Services Office in Sleman Regency). Applied Research on Civil Engineering and Environment (ARCEE). https://doi.org/10.32722/arcee.v1i02.2680

Vancouver

Nugraheni F, Abma V, Yasien S. Scheduling of Application for Siteplan Authorization Permit (Case of Licensing Process at Investment and Integrated Licensing Services Office in Sleman Regency). Applied Research on Civil Engineering and Environment (ARCEE). 2020. doi:10.32722/arcee.v1i02.2680

BibTeX
@article{Nugraheni2020,
  author = {Nugraheni, Fitri and Abma, Vendie and Yasien, Sigit},
  title = {Scheduling of Application for Siteplan Authorization Permit (Case of Licensing Process at Investment and Integrated Licensing Services Office in Sleman Regency)},
  journal = {Applied Research on Civil Engineering and Environment (ARCEE)},
  year = {2020},
  doi = {10.32722/arcee.v1i02.2680}
}
Kostenlos starten →