The Implications of International Urban Rail Transit Operation Project Management: a Case Study of Jerusalem`s Light Rail Project
Architecture Engineering and Science · 2021
DOI: 10.32629/aes.v2i2.367 ↗Kurz gefasst
Fachartikel in der Zeitschrift Architecture Engineering and Science, 2021. Verfasst von Yi Guo. Die Arbeit wurde bisher 1-mal zitiert (Crossref).
Abstract (Originalsprache)
Jerusalem light rail project as the first light rail line in Israel has already been opened and in operation for 5 years, with good operation condition and quite similar operation mode and characteristics to Tel Aviv light rail project. The technical leading member of its operational consortium, French Veolia, has rich experience in overseas rail transit operation and had fully participated in the Jerusalem light rail project since 2005 till being expelled from Israel in 2015. This paper analysis Veolia's 10-year experience and lessons obtained from operation of the Jerusalem light rail project. It was reflected the actual operation environment of the project in Israel and can be used as a crucial reference for the operation of international rail transit.
Zitieren
APA
Guo, Y. (2021). The Implications of International Urban Rail Transit Operation Project Management: a Case Study of Jerusalem`s Light Rail Project. Architecture Engineering and Science. https://doi.org/10.32629/aes.v2i2.367
Vancouver
Guo Y. The Implications of International Urban Rail Transit Operation Project Management: a Case Study of Jerusalem`s Light Rail Project. Architecture Engineering and Science. 2021. doi:10.32629/aes.v2i2.367
BibTeX
@article{Guo2021,
author = {Guo, Yi},
title = {The Implications of International Urban Rail Transit Operation Project Management: a Case Study of Jerusalem`s Light Rail Project},
journal = {Architecture Engineering and Science},
year = {2021},
doi = {10.32629/aes.v2i2.367}
}
EUVIMED