EUVIMEDEUVIMED entdecken
Open Access · CC BY-SA 4.0

METODE PELAKSANAAN PONDASI BORE PILE PADA PEKERJAAN PENANGANAN LONGSORAN PROYEK PRESERVASI JALAN CIREBON – PALIMANAN – SUMEDANG

Adil Fadli, Arief Rijaluddin

SEMINAR TEKNOLOGI MAJALENGKA (STIMA) · 2023

DOI: 10.31949/stima.v7i0.853 ↗

Kurz gefasst

Fachartikel in der Zeitschrift SEMINAR TEKNOLOGI MAJALENGKA (STIMA), 2023. Verfasst von Adil Fadli und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Implementation of bore pile foundation on the Cirebon - Palimanan - Sumedang road Preservation Project is one of the work items for handling landslides which aims to strengthen the retaining wall structure from the load it will carry so that there is no shifting and settlement, the retaining wall structure was built due to the previous existing conditions has experienced a collapse so that a new retaining wall is planned. The foundation used in the construction of retaining walls, namely the bore pile foundation, is a type of deep foundation whose installation is carried out by first drilling the soil with a certain diameter using heavy equipment, bore pile machine until it reaches a predetermined depth, then the assembled steel frame is inserted. drill hole and the next step is casting. The purpose of this study is to find out how the process and method of implementing bore pile foundations in the avalanche handling work of the Cirebon - Palimanan - Sumedang Road Preservation Project. In the method of carrying out bore pile foundations for avalanche handling work on the Cirebon - Palimanan - Sumedang road preservation project, there are several stages of work including preparation, ironing, drilling, casting, and Test Pile.

Zitieren

APA

Fadli, A., & Rijaluddin, A. (2023). METODE PELAKSANAAN PONDASI BORE PILE PADA PEKERJAAN PENANGANAN LONGSORAN PROYEK PRESERVASI JALAN CIREBON – PALIMANAN – SUMEDANG. SEMINAR TEKNOLOGI MAJALENGKA (STIMA). https://doi.org/10.31949/stima.v7i0.853

Vancouver

Fadli A, Rijaluddin A. METODE PELAKSANAAN PONDASI BORE PILE PADA PEKERJAAN PENANGANAN LONGSORAN PROYEK PRESERVASI JALAN CIREBON – PALIMANAN – SUMEDANG. SEMINAR TEKNOLOGI MAJALENGKA (STIMA). 2023. doi:10.31949/stima.v7i0.853

BibTeX
@article{Fadli2023,
  author = {Fadli, Adil and Rijaluddin, Arief},
  title = {METODE PELAKSANAAN PONDASI BORE PILE PADA PEKERJAAN PENANGANAN LONGSORAN PROYEK PRESERVASI JALAN CIREBON – PALIMANAN – SUMEDANG},
  journal = {SEMINAR TEKNOLOGI MAJALENGKA (STIMA)},
  year = {2023},
  doi = {10.31949/stima.v7i0.853}
}
Kostenlos starten →