EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC-ND 4.0

Maintenance Scheduling and Cost Planning Analysis: A Case Study of The Rusunawa Jongke in Yogyakarta

Muhammad Thoriq Faroh Wibowo, Albani Musyafa'

Jurnal Permukiman · 14.10.2026 · 113-124

DOI: 10.31815/jp.v21i2.672 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Jurnal Permukiman, online erschienen am 14.10.2026. Verfasst von Muhammad Thoriq Faroh Wibowo und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Buildings require a structured maintenance system to ensure their serviceability, safety, and functionality throughout their intended lifespan, with schedules and costs aligned to applicable regulations. However, the Rusunawa Jongke Block D building currently lacks a proper maintenance framework, making the development of a systematic maintenance plan essential. This study analyzes routine maintenance schedules based on the Ministry of Public Works Regulations Number 16 of 2010 and Number 24 of 2008, using the Analytical Hierarchy Process (AHP) and interview-based weighting. Cost analysis is conducted using assumed labor and equipment coefficients and several activities listed in the Appendix of the Director General of Construction Development No. 68/SE/Dk/2024. The results show five priority maintenance components: structural (29%), architectural (29%), mechanical (17%), electrical (14%), and outdoor areas (12%). The estimated maintenance cost is $61.433,55, or $42.580,83 per year when excluding activities conducted only every 3–5 years. This amount is still within the government’s maintenance budget allocation of 2% of the total building value ($46.878,39), as stipulated in the 2024 Governor’s Decree of the Special Region of Yogyakarta Number 75/KEP/2024. Therefore, the proposed maintenance plan is financially feasible for implementation.

Zitieren

APA

Wibowo, M. T. F., & Musyafa', A. (2026). Maintenance Scheduling and Cost Planning Analysis: A Case Study of The Rusunawa Jongke in Yogyakarta. Jurnal Permukiman, 113-124. https://doi.org/10.31815/jp.v21i2.672

Vancouver

Wibowo MTF, Musyafa' A. Maintenance Scheduling and Cost Planning Analysis: A Case Study of The Rusunawa Jongke in Yogyakarta. Jurnal Permukiman. 2026:113-124. doi:10.31815/jp.v21i2.672

BibTeX
@article{Wibowo2026,
  author = {Wibowo, Muhammad Thoriq Faroh and Musyafa', Albani},
  title = {Maintenance Scheduling and Cost Planning Analysis: A Case Study of The Rusunawa Jongke in Yogyakarta},
  journal = {Jurnal Permukiman},
  year = {2026},
  pages = {113--124},
  doi = {10.31815/jp.v21i2.672}
}
Kostenlos starten →