Developing a delay risk model for toll road construction project: A conceptual framework
Applied Engineering and Technology · 2022
DOI: 10.31763/aet.v1i2.676 ↗Kurz gefasst
Fachartikel in der Zeitschrift Applied Engineering and Technology, 2022. Verfasst von G A Pratama und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).
Abstract (Originalsprache)
In the realization of the medium-term development plan in 2014-2019 (RPJMN), toll road construction development was only reached 51 percent. construction projects had complex and dynamic nature, which caused delays, construction risk assessment that considers risk as a system was done before, for example, using techniques such as SD, Fuzzy DEMATEL, STEEP-SD, DEMATEL-ANP, and SD-DEMATEL, but the technique still has some shortcomings. in indonesia, research related to this matter is still rarely done, to address this concern, we propose a conceptual framework that can be used to develop a delay risk model for toll road construction project especially in indonesia. for this purpose, we introduce the system dynamic-fuzzy dematel-anp (sd-fdanp) method. the results of the development of the sd-fdanp method can be used as a guideline that can help achieve behavioral knowledge of delays and the success of risk assessment in toll road infrastructure development projects.
Zitieren
APA
Pratama, G. A., & Latief, Y. (2022). Developing a delay risk model for toll road construction project: A conceptual framework. Applied Engineering and Technology. https://doi.org/10.31763/aet.v1i2.676
Vancouver
Pratama GA, Latief Y. Developing a delay risk model for toll road construction project: A conceptual framework. Applied Engineering and Technology. 2022. doi:10.31763/aet.v1i2.676
BibTeX
@article{Pratama2022,
author = {Pratama, G A and Latief, Y},
title = {Developing a delay risk model for toll road construction project: A conceptual framework},
journal = {Applied Engineering and Technology},
year = {2022},
doi = {10.31763/aet.v1i2.676}
}
EUVIMED